Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (6) :187-195    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research and Application of the Construction Ventilation Techniques for Large Underground Cavern Group
(China Three Gorges projects development Co.,Ltd,Chengdu 610041)
Download: PDF (5313KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract NATM and mining method are often adopted in the construction of underground caverns, the pollutant produced by blasting at working face affects safety and occupational health of workers and restricts the advance rate.Based on the Baihetan hydropower station project, the design concepts of " three-in-one combination" and "design by stages" for the construction ventilation system are proposed, a three-dimensional unsteady turbulent field model is established, the characteristics and law of smoke emission during ventilation of complex underground cavern group are studied, special ventilation tunnel connecting to the main caverns is planned and an energy-efficient“ air supplying + air exhausting”ventilation system is formed, the frequency conversion fan is adopted to realize the optimal effect of mechanical ventilation based on use of natural ventilation. The numerical calculation and test results of pollutant concentration at site show that air distributes smoothly, the air velocity in the vertical shaft area is much larger than that near the cavern group, the emission paths of pollutant are working face, ventilation shaft and special ventilation adit, the pollutant produced by blasting can be fully discharged after 15 minutes of ventilation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SUN Huixiang WANG Haiping
KeywordsUnderground plant   Construction period   Ventilation system   Fluid numerical calculation     
Abstract: NATM and mining method are often adopted in the construction of underground caverns, the pollutant produced by blasting at working face affects safety and occupational health of workers and restricts the advance rate.Based on the Baihetan hydropower station project, the design concepts of " three-in-one combination" and "design by stages" for the construction ventilation system are proposed, a three-dimensional unsteady turbulent field model is established, the characteristics and law of smoke emission during ventilation of complex underground cavern group are studied, special ventilation tunnel connecting to the main caverns is planned and an energy-efficient“ air supplying + air exhausting”ventilation system is formed, the frequency conversion fan is adopted to realize the optimal effect of mechanical ventilation based on use of natural ventilation. The numerical calculation and test results of pollutant concentration at site show that air distributes smoothly, the air velocity in the vertical shaft area is much larger than that near the cavern group, the emission paths of pollutant are working face, ventilation shaft and special ventilation adit, the pollutant produced by blasting can be fully discharged after 15 minutes of ventilation.
KeywordsUnderground plant,   Construction period,   Ventilation system,   Fluid numerical calculation     
Cite this article:   
SUN Huixiang WANG Haiping .Research and Application of the Construction Ventilation Techniques for Large Underground Cavern Group[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(6): 187-195
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I6/187
 
No references of article
[1] WANG Mingnian1,2 GUO Xiaohan1,2 CUI Peng1,2 YU Li1,2.Discussion on the Key Techniques for Disaster Prevention, Evacuation and Rescue of Large-scale Railway Tunnel Group in High Altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 1-7
[2] ZHU Yongsheng1 LI Pengfei2.Research Progress of Hoek-Brown Strength Criterion and Determination of Mechanical Parameters of Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 8-17
[3] ZHENG Yuchao1 ZHANG Wensheng1 SUN Keguo1 CAI Jialiang1 LI Jie2 LENG Biao1 ZHAO Ruiwen2.Study on the Stability of Large-Span Tunnel by Distinct Element Based Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 18-25
[4] LIU Xuezeng1,2 CAI Xin3 DING Maorui3 CHEN Fubin3 DENG Feng3.Study on Health Evaluation Method of Large-Span Highway Tunnel with Fractured Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 26-35
[5] TAO Weiming1 LI Huayun2 ZHANG Zhiqiang2 GUO Yongfa3.Study on the Shear Strength of Surrounding Rocks and Mechanical Behaviors of Supporting Structure of the Shallow-buried Tunnel in Swelling Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 36-43
[6] MA Shiqiang1,2.On Relationship between Surrounding Rock Deformation and Surrounding Rock Pressure under Large Deformation of Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 44-50
[7] DU Jun1,2 MEI Zhirong2 FU Lilei3 CHEN Yongzhao3.Study on Working Face Stability of the Shallow-buried Tunnel in Soft Surrounding Rocks Based on Strength Reduction Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 51-57
[8] GUO Chenggang1 GUO Yongfa2 ZHU Menglong3 ZHANG Qingwen3.Hydrogeological Investigation of the Underground River of Karst Tunnel in Carbonate Rock of Red Bed[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 58-64
[9] ZHAN Xianjun PEI Taotao ZHOU Jibing.Visualization Analysis of Metro Station Deformation Based on Thermodynamic Diagram[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 65-69
[10] CAI Yaning1 HUANG Qingjie2.Relevant Standards and Quality Management of the Mould for Reinforced Concrete Segments of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 70-75
[11] YAN Tao1 LI Kunjie1 QIN Pengcheng1 CHEN Jingyu1,2 LIN Rui3 ZUO Qiang3.Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 76-82
[12] WANG Jun LIN Guojin.Study on the Characteristics of Secondary Lining Cracking under the Effect of Rheological Load[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 83-90
[13] LIN Zhibin ZHANG Boyang YANG Dafang.Simulation Study on Foundation Pit Excavation in Soft Soil Considering Effect of Creep and Seepage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 91-98
[14] PENG Qi.Influence of Foundation Construction and Additional Load of Transfer Structure on Underneath Metro Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 99-104
[15] PENG Yan1,2 FANG Hui1,2 LV Qinyin1,2.Forward and Inversion Simulation of Tunnel Reflection Wave Tomography and a Contrastive Analysis of TRT Inversion[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 105-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY