Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (4) :1-14    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
A Review of Spray-applied Waterproofing Membrane Technology for Drill-and-Blast Tunnels
(1. Qingdao Metro Line 6 Co.,ltd, Qingdao 266427; 2. School of Qilu Transpotation, Shandong University, Jinan 250002)
Download: PDF (4091KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To address the issues of poor adhesion, water leakage, and difficult repairs associated with traditional wa? terproofing sheets, this paper reviews the types, performance, structural design, and construction applications of spray-applied waterproofing membranes in composite linings, and analyzes the current status and development trends of this technology. Firstly, the development history of spray-applied waterproofing membrane materials is summarized, comparing the waterproofing performance, durability, adhesion, and mechanical properties of different materials, while analyzing the influence of interfacial behavior and failure mechanisms on structural performance.Secondly, through numerical simulations and engineering case studies, the advantages of spray-applied waterproofing membrane linings in terms of load-bearing capacity and construction efficiency are verified, with key technical requirementsfor construction processes elaborated. Finally, the challengesin occupational health and safety,standardization, and adaptability to complex conditions are identified, suggesting future improvements through material optimization, development of environmentally friendly products, refinement of design theories, and standardization of construction techniques to promote wider application in tunnel waterproofing engineering.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Shaoyu1 WANG Xiaotian2 ZHANG Peiyuan1 LIU Shengchen1 LI Shuchen2 LI Luoning2
KeywordsSpray-applied waterproofing membrane lining   Spray-applied waterproofing membrane material   Material properties   Interface mechanical behavior   Construction technology   Technical challenges     
Abstract: To address the issues of poor adhesion, water leakage, and difficult repairs associated with traditional wa? terproofing sheets, this paper reviews the types, performance, structural design, and construction applications of spray-applied waterproofing membranes in composite linings, and analyzes the current status and development trends of this technology. Firstly, the development history of spray-applied waterproofing membrane materials is summarized, comparing the waterproofing performance, durability, adhesion, and mechanical properties of different materials, while analyzing the influence of interfacial behavior and failure mechanisms on structural performance.Secondly, through numerical simulations and engineering case studies, the advantages of spray-applied waterproofing membrane linings in terms of load-bearing capacity and construction efficiency are verified, with key technical requirementsfor construction processes elaborated. Finally, the challengesin occupational health and safety,standardization, and adaptability to complex conditions are identified, suggesting future improvements through material optimization, development of environmentally friendly products, refinement of design theories, and standardization of construction techniques to promote wider application in tunnel waterproofing engineering.
KeywordsSpray-applied waterproofing membrane lining,   Spray-applied waterproofing membrane material,   Material properties,   Interface mechanical behavior,   Construction technology,   Technical challenges     
Cite this article:   
YANG Shaoyu1 WANG Xiaotian2 ZHANG Peiyuan1 LIU Shengchen1 LI Shuchen2 LI Luoning2 .A Review of Spray-applied Waterproofing Membrane Technology for Drill-and-Blast Tunnels [J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(4): 1-14
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I4/1
 
No references of article
[1] CHEN Yue1 SU Zongxian2.Technical Challenges in the Artificial Island and Immersed Tunnel Works of Hong Kong-Zhuhai-Macao Bridge Project[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 214-222
[2] SHAN Hongwei1 SUN Mao2 XIAN Jianping2 ZHU Li2 YU Haitao3.Mechanical Properties of Prefabricated Assembly Utility Tunnel Construction and Field Full-scale Test Study in the Process of Erection of Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 147-153
[3] LIU Shijie LIU Ze WU Jianhe ZHONG Youjiang.Ground Surface Grouting Techniques for the Railway Tunnel in Completely Weathered Granite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 181-186
[4] SUN Guoqing PENG Feng ZOU Mingbo.Research and Application of New Grouting Technology with Rigid Sleeve Valve Pipe Strand[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 186-191
[5] YUAN Rongtao1 ZHAI Renfeng2 CHEN Haitao1.Application of Innovative Waterproof Board Laying Trolley in the Beitaizi Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 206-211
[6] YAN Jinxiu1,2.Technical Challenges of Super-Long Mountainous Tunnels at Great Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 1-5
[7] JIANG Yajun1 YANG Qixin1 LIU Dongmin2 SHENG Caoying3.Application and Development of a Sprayed Waterproof Membrane for Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 11-19
[8] GUO Jun1 WU Gang2 SHEN Yongfang2 XI Xiaozhou2.Full-Scale Model Test for Sand-Filling Foundation Construction Technology in the Nanchang Honggu Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 56-62
[9] DOU Ji-Ping-1, Chen-De-Jian-2.Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(6): 154-159
[10] XIAO Guang-Zhi, You, Xu.Application of the Advance Support of High-Pressure Horizontal Jet Grouting Piles in Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 108-114
[11] .Design and Construction of the Underpinning of a River-Crossing
Bridge Pile Foundation in a Metro Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 164-169
[12] JI Xia-Fang, CHANG Bao.Discussion of Water Stop Construction Technology for the Construction Joints of a Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 170-173
[13] WANG Qing-Lin-1,HAO Jun-Suo-2, SHEN Dian-Cheng-2.Construction Techniques for Advance Drilling in the Meilingguan Gas Tunnel on the Lanzhou-Chongqing Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 89-93
[14] DENG Bin-1, GU Xiao-Fang-2.Shield Construction Risks and Quality Control Measures for Lot 2222 of the Shenzhen Metro Line 2[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(2): 21-27
[15] YUAN Jun-Ting, LIN Li-Fang, XI Ji-Hong, LUO Wen-Xue.Pipe-Roof Advanced Support in Shallowand Bias Loess Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(6): 137-140
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY