Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (6) :154-159    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel
(1 Construction Headquarters of the Fugu Coal Dedicated Railway Line, Fugu 719400; 2 China Railway Fifth Survey and Design Institute Group Co. Ltd., Beijing 102600)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In light of the clearance intrusion of the primary support in the Sujiawan tunnel, this paper determines relevant parameters for controlling support deformation based on checking the support structure and secondary lining with MIDAS-GTS software and analyzing the geological conditions of the tunnel body. Reasonable countermeasures are proposed after the analysis of required construction technologies, including strengthening geological surveys of the top of the tunnel's central line, improving the drainage system, enhancing the support system with an increased reserved deformation allowance, and intensifying tunnel monitoring and measurements.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DOU Ji-Ping-1
Chen-De-Jian-2
Keywords Loess tunnel   Primary support   Clearance intrusion   Countermeasures   Construction technology     
Abstract: In light of the clearance intrusion of the primary support in the Sujiawan tunnel, this paper determines relevant parameters for controlling support deformation based on checking the support structure and secondary lining with MIDAS-GTS software and analyzing the geological conditions of the tunnel body. Reasonable countermeasures are proposed after the analysis of required construction technologies, including strengthening geological surveys of the top of the tunnel's central line, improving the drainage system, enhancing the support system with an increased reserved deformation allowance, and intensifying tunnel monitoring and measurements.
Keywords Loess tunnel,   Primary support,   Clearance intrusion,   Countermeasures,   Construction technology     
published: 2013-11-27
Cite this article:   
DOU Ji-Ping-1, Chen-De-Jian-2 .Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(6): 154-159
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I6/154
 
No references of article
[1] SUN Guoqing PENG Feng ZOU Mingbo.Research and Application of New Grouting Technology with Rigid Sleeve Valve Pipe Strand[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 186-191
[2] YUAN Rongtao1 ZHAI Renfeng2 CHEN Haitao1.Application of Innovative Waterproof Board Laying Trolley in the Beitaizi Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 206-211
[3] KONG Qingxiang.Study on Deformation Law and Key Points of Construction Management of Loess Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 18-23
[4] WANG Jianyu.Discussion on the Composite Shell Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 1-5
[5] ZHANG Junru1 OU Xiaoqiang1,2 ZHENG Qiang1 GONG Yanfeng3.On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 108-116
[6] .Dynamic Evaluation of Reliability and Stability of the Primary Support of a Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 140-145
[7] JIANG Yajun1 YANG Qixin1 LIU Dongmin2 SHENG Caoying3.Application and Development of a Sprayed Waterproof Membrane for Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 11-19
[8] LI Guoliang LI Ning.Discussion of Tunnelling in Squeezed Surrounding Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 1-6
[9] GUO Jun1 WU Gang2 SHEN Yongfang2 XI Xiaozhou2.Full-Scale Model Test for Sand-Filling Foundation Construction Technology in the Nanchang Honggu Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 56-62
[10] .Support Deformation Induced Clearance Invasion and Treatment for a Pelitic Soft-Rock Tunnel Passing through a Water-Rich Fault Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 181-189
[11] LAI Jinxing1 QIU Junling1 NIU Fanyuan1,2 FAN Haobo1,4 WANG Ke1,3.The Effects of Treatment of Collapses in Shallow-Buried Loess Tunnels with Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 194-201
[12] JIN Mei-Hai- 1, 2 Li-Dong-Liang- 1, 2 Liu-Xin-Rong- 1, 2 Liu-Feng-Ming- 3.Research on the Reserved Deformations of Unsymmetrical Loading Loess Tunnels with Different Slopes[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 130-137
[13] GAO Deng.Analysis of the Causes and Treatment Measures for a Collapse in the Shangpingge Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 191-197
[14] LI Guo-Liang.Construction Techniques for Large-Section Loess Tunnels of High-Speed Railways by Bench Method[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 6-16
[15] ZHANG Tang-Jie- 1, 2 , 3 Liang-Qing-Guo- 1, 2 Wu-Xu-Yang- 1, 2 Wang-Xin-Dong.Experimental Study on the Mechanical Characteristics of the Xujiachuan Loess Tunnel on the Baoji—Lanzhou PDL[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 85-91
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY