|
2014, Vol. 51(6): 154-159 DOI: | ||
Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel | ||
(1 Construction Headquarters of the Fugu Coal Dedicated Railway Line, Fugu 719400; 2 China Railway Fifth Survey and Design Institute Group Co. Ltd., Beijing 102600) | ||
Received null Revised null | ||
Supporting info | ||
|