现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(6): 154-159    DOI:
Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel
(1 Construction Headquarters of the Fugu Coal Dedicated Railway Line, Fugu 719400; 2 China Railway Fifth Survey and Design Institute Group Co. Ltd., Beijing 102600)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn