Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (2) :214-222    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Technical Challenges in the Artificial Island and Immersed Tunnel Works of Hong Kong-Zhuhai-Macao Bridge Project
(1. Shenzhen-Zhongshan Link Administration Center, Zhongshan 528400; 2. The Hong Kong University of Science and Technology (Guangzhou), Guangzhou 511455)
Download: PDF (4829KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The artificial island and immersed tunnel works of the Hong Kong-Zhuhai-Macao Bridge project is the controlling works of the entire bridge project, facing various difficulties such as poor geological conditions, high offshore operations risks, high construction standards, and tight schedules. It has become the longest highway immersed tunnel in the world after completion. The Hong Kong-Zhuhai-Macao Bridge was officially opened in 2018,and the main project passed the completion acceptance in 2023. This paper re-examines the difficulties and technical challenges faced during the construction of the Hong Kong-Zhuhai-Macao Bridge. Adhering to the construction concept and focusing on scientific and technological management, the bridge builders formed several key technologies through research and practice, such as rapid artificial island formation in the sea, foundation treatment and settlement control of immersed tunnel in deep soft soils, and prefabrication of tunnel elements in factory. These achievements have strongly supported the construction of the artificial island and tunnel project, laid the foundation for subsequent large-scale river and sea-crossing artificial island and tunnel projects, and contributed Chinese wisdom to the construction of sea-crossing artificial island and tunnel projects in the world.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Yue1 SU Zongxian2
KeywordsHong Kong-Zhuhai-Macao Bridge   Immersed tunnel   Artificial island   Technical challenges   Factory production     
Abstract: The artificial island and immersed tunnel works of the Hong Kong-Zhuhai-Macao Bridge project is the controlling works of the entire bridge project, facing various difficulties such as poor geological conditions, high offshore operations risks, high construction standards, and tight schedules. It has become the longest highway immersed tunnel in the world after completion. The Hong Kong-Zhuhai-Macao Bridge was officially opened in 2018,and the main project passed the completion acceptance in 2023. This paper re-examines the difficulties and technical challenges faced during the construction of the Hong Kong-Zhuhai-Macao Bridge. Adhering to the construction concept and focusing on scientific and technological management, the bridge builders formed several key technologies through research and practice, such as rapid artificial island formation in the sea, foundation treatment and settlement control of immersed tunnel in deep soft soils, and prefabrication of tunnel elements in factory. These achievements have strongly supported the construction of the artificial island and tunnel project, laid the foundation for subsequent large-scale river and sea-crossing artificial island and tunnel projects, and contributed Chinese wisdom to the construction of sea-crossing artificial island and tunnel projects in the world.
KeywordsHong Kong-Zhuhai-Macao Bridge,   Immersed tunnel,   Artificial island,   Technical challenges,   Factory production     
Cite this article:   
CHEN Yue1 SU Zongxian2 .Technical Challenges in the Artificial Island and Immersed Tunnel Works of Hong Kong-Zhuhai-Macao Bridge Project[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(2): 214-222
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I2/214
 
No references of article
[1] DENG Xiaohua1 CHEN Weile2,3 SONG Shenyou2,3 WU Yugang1 LIU Jian2 JIN Wenliang2 CHEN Yue2.Key Technologies for the Construction of the Shenzhen-Zhongshan Link Steel Shell Concrete Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 203-213
[2] WANG Mingjun1 LIANG Qizhi1 HUANG Yongbin2 LI Yadong2 YANG Chunshan3.Study on Seismic Response Characteristics of Immersed Tube Tunnels with Longitudinal Limit Device[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 106-115
[3] JIANG Shuping1,2 LI Jing1 ZHANG Dandan1 CAO Peng2.Experimental Study on the Law of Heat Transfer of Tube Structure of the Steel-concrete-steel Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 168-178
[4] WANG Yong XU Guoping LI Yong LIU Minghu REN Yaopu XU Yu FAN Zhe.Key Technologies in the Design of the Xiangyang Hanjiang Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 192-199
[5] WANG Weiqiang LUO Yonghuan KONG Lingjun ZHANG Yinxi CHEN Yanbei.Numerical Simulation and Experimental Study of Mechanical Properties of GINA Waterstop[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 237-243
[6] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[7] WU Jiancheng.Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 145-150
[8] ZHAO Guoyun1 WU Weihua2 LI Shuliang3.Research on the Key Performances of Asphalt Protection Layer for the Concrete Pavement of the Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 142-148
[9] HU Jianzhong1 WANG Yong2 XU Guoping2 XU Yu2 YU Guangzhong3 GONG Yi2.Experimental Study and Selection Design of Domestic GINA Gasket for the Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 171-177
[10] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[11] WEI Gang1 LU Shijie2.Present Status and Prospects of Research on Flexible Joint Models of Immersed Tube Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 6-13
[12] FENG Haibao1,2,3 SU Changxi3.Analysis of Treatment Methods for the Foundation of the Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 33-38
[13] CHEN Fuqiang1,2 TIAN Wei1,2 ZHANG Yongtao1,2 ZHAI Shihong1,2.Model Test on Mechanism of Shear Resistance Borne by Concrete Shear Key and Friction of Element Joint of the Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 163-169
[14] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 97-105
[15] HU Zhinan1,2,3 FENG Huaiping1 MA Chaochao4 ZHAO Yucheng1 ZHANG Qian3.Load-Bearing Stages of Joint Shear Keys and Settlement Control Standards of Immersed Tunnel Elegments[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 132-138
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY