Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft
(1 Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd, Chengdu 610041; 2 Tunnel Sub-committee, Sichuan Highway & Transportation Society, Chengdu 610041)
Download: PDF (2284KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to discuss the design rationality of the overall construction scheme for the super-long highway tunnel with auxiliary adit, and accurately control the construction period and cost, the principles of construction with the help of auxiliary adit are discussed, the auxiliary construction efficiency and construction cost per linear meter by using shaft are calculated, the designed water inflow volume for shaft in case of adverse grade construction is estimated, and it comes the following conclusions: (1) it is necessary to use auxiliary adit to assist the construction of tunnels with distance of blind heading more than 5,000 meters or tunnel length larger than 10,000 meters, and the ventilation shaft should be given a priority as an auxiliary adit if it is set for operation ventilation; (2) the auxiliary construction by vertical shaft (inclined shaft with rail) is expensive and its lifting capacity is limited, the trackless in? clined shaft, parallel adit or cross passage should be chosen preferably regarding the auxiliary construction of tunnels and the slope should be controlled within 12.3%; (3) on the basis of predicted water inflow volume and the assumption of homogeneous aquifer, the calculation method of designed water inflow volume during construction and the rational allocation of drainage facilities are given.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TANG Xie1 LIN Guojin1
2 HE Jia1 WANG Jun1
KeywordsSuper-long tunnel   Drilling and blasting method   Overall construction scheme   Auxiliary adit   Auxilia? ry construction   Designed water inflow volume   Scheme comparison and selection     
Abstract: In order to discuss the design rationality of the overall construction scheme for the super-long highway tunnel with auxiliary adit, and accurately control the construction period and cost, the principles of construction with the help of auxiliary adit are discussed, the auxiliary construction efficiency and construction cost per linear meter by using shaft are calculated, the designed water inflow volume for shaft in case of adverse grade construction is estimated, and it comes the following conclusions: (1) it is necessary to use auxiliary adit to assist the construction of tunnels with distance of blind heading more than 5,000 meters or tunnel length larger than 10,000 meters, and the ventilation shaft should be given a priority as an auxiliary adit if it is set for operation ventilation; (2) the auxiliary construction by vertical shaft (inclined shaft with rail) is expensive and its lifting capacity is limited, the trackless in? clined shaft, parallel adit or cross passage should be chosen preferably regarding the auxiliary construction of tunnels and the slope should be controlled within 12.3%; (3) on the basis of predicted water inflow volume and the assumption of homogeneous aquifer, the calculation method of designed water inflow volume during construction and the rational allocation of drainage facilities are given.
KeywordsSuper-long tunnel,   Drilling and blasting method,   Overall construction scheme,   Auxiliary adit,   Auxilia? ry construction,   Designed water inflow volume,   Scheme comparison and selection     
Cite this article:   
TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1 .Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 12-19
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/12
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[3] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[4] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[5] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[6] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[7] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[8] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[9] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[10] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[11] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[12] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[13] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[14] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[15] MI Shipeng.Research on Soil Plug Pressure-bearing Characteristics of Screw Conveyor with Variable Pitch[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 119-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY