Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft
(1 Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd, Chengdu 610041; 2 Tunnel Sub-committee, Sichuan Highway & Transportation Society, Chengdu 610041)
Download: PDF (2284KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to discuss the design rationality of the overall construction scheme for the super-long highway tunnel with auxiliary adit, and accurately control the construction period and cost, the principles of construction with the help of auxiliary adit are discussed, the auxiliary construction efficiency and construction cost per linear meter by using shaft are calculated, the designed water inflow volume for shaft in case of adverse grade construction is estimated, and it comes the following conclusions: (1) it is necessary to use auxiliary adit to assist the construction of tunnels with distance of blind heading more than 5,000 meters or tunnel length larger than 10,000 meters, and the ventilation shaft should be given a priority as an auxiliary adit if it is set for operation ventilation; (2) the auxiliary construction by vertical shaft (inclined shaft with rail) is expensive and its lifting capacity is limited, the trackless in? clined shaft, parallel adit or cross passage should be chosen preferably regarding the auxiliary construction of tunnels and the slope should be controlled within 12.3%; (3) on the basis of predicted water inflow volume and the assumption of homogeneous aquifer, the calculation method of designed water inflow volume during construction and the rational allocation of drainage facilities are given.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TANG Xie1 LIN Guojin1
2 HE Jia1 WANG Jun1
KeywordsSuper-long tunnel   Drilling and blasting method   Overall construction scheme   Auxiliary adit   Auxilia? ry construction   Designed water inflow volume   Scheme comparison and selection     
Abstract: In order to discuss the design rationality of the overall construction scheme for the super-long highway tunnel with auxiliary adit, and accurately control the construction period and cost, the principles of construction with the help of auxiliary adit are discussed, the auxiliary construction efficiency and construction cost per linear meter by using shaft are calculated, the designed water inflow volume for shaft in case of adverse grade construction is estimated, and it comes the following conclusions: (1) it is necessary to use auxiliary adit to assist the construction of tunnels with distance of blind heading more than 5,000 meters or tunnel length larger than 10,000 meters, and the ventilation shaft should be given a priority as an auxiliary adit if it is set for operation ventilation; (2) the auxiliary construction by vertical shaft (inclined shaft with rail) is expensive and its lifting capacity is limited, the trackless in? clined shaft, parallel adit or cross passage should be chosen preferably regarding the auxiliary construction of tunnels and the slope should be controlled within 12.3%; (3) on the basis of predicted water inflow volume and the assumption of homogeneous aquifer, the calculation method of designed water inflow volume during construction and the rational allocation of drainage facilities are given.
KeywordsSuper-long tunnel,   Drilling and blasting method,   Overall construction scheme,   Auxiliary adit,   Auxilia? ry construction,   Designed water inflow volume,   Scheme comparison and selection     
Cite this article:   
TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1 .Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 12-19
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/12
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY