|
2020, Vol. 57(4): 12-19 DOI: | ||
Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft | ||
(1 Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd, Chengdu 610041; 2 Tunnel Sub-committee, Sichuan Highway & Transportation Society, Chengdu 610041) | ||
Received null Revised null | ||
Supporting info | ||
|