Optimal Design of the Cutterhead of the Earth Pressure Balance Shield Used in Lanzhou Metro in Water-rich Sandy Cobble Stratum
(1 Lanzhou Rail Transit Co., Ltd., Lanzhou 730000; 2 Lanzhou Municipal Construction Group Co., Ltd. Lanzhou 730000)
Download: PDF (1508KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Taking the driving of the earth pressure balance shield used in Lanzhou metro in water- rich sandy cob? ble stratum with large grain size as the background, a series of studies are conducted regarding serious wear of cutting tools, frequent stucking of cutterhead and screw conveyor, difficulty to reach earth pressure balance and so on,and optimal design is carried out in terms of the type of cutterhead structure, cutterhead opening ratio, cutting tool improvement, rated torque of cutterhead and the screw conveyor. The practice shows that the shield driving efficiency increases by 1 time, the cutterhead torque reduces by 20%, the frequency of cutting tool replacement decreases by about 50%, and the mud-cake and surface settlement controlling are significantly improved.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SUN Hongbin1 JIN Shihe1 WEI Yanlong2 DING Jun2
KeywordsMetro tunnel   Earth-pressure balance shield   Sandy cobble stratum;Optimal design of cutterhead; Opening ratio   Cutting tool   Rated torque   Screw conveyor     
Abstract: Taking the driving of the earth pressure balance shield used in Lanzhou metro in water- rich sandy cob? ble stratum with large grain size as the background, a series of studies are conducted regarding serious wear of cutting tools, frequent stucking of cutterhead and screw conveyor, difficulty to reach earth pressure balance and so on,and optimal design is carried out in terms of the type of cutterhead structure, cutterhead opening ratio, cutting tool improvement, rated torque of cutterhead and the screw conveyor. The practice shows that the shield driving efficiency increases by 1 time, the cutterhead torque reduces by 20%, the frequency of cutting tool replacement decreases by about 50%, and the mud-cake and surface settlement controlling are significantly improved.
KeywordsMetro tunnel,   Earth-pressure balance shield,   Sandy cobble stratum;Optimal design of cutterhead; Opening ratio,   Cutting tool,   Rated torque,   Screw conveyor     
Cite this article:   
SUN Hongbin1 JIN Shihe1 WEI Yanlong2 DING Jun2 .Optimal Design of the Cutterhead of the Earth Pressure Balance Shield Used in Lanzhou Metro in Water-rich Sandy Cobble Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(5): 239-242
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I5/239
 
No references of article
[1] YAN Jian1,2 WEI Yanqing3 HE Chuan1 ZHOU Zihan1 GOU Hao1.Hot-freeze Link Technology and Its Application in Snow Melting and Deicing of Tunnel Portal Section of Sichuan-Tibet Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 1-9
[2] YAN Xidong1 GAO Jun1 HAN Fei2 LI Zheng1.Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 10-22
[3] WANG Shuaishuai1,2 CHEN Guizhou2 GUO Chun2 BAI Yonghou3.On Power Performances of Tunnel Construction Machinery at High-altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 23-29
[4] GONG Chenjie1 YANG Junsheng1 FU Jinyang1, 2.Characteristics and Influencing Factors of Segment Cracking of LargeDiameter River-Crossing Shield Tunnelling in Composite Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 30-42
[5] ZHANG Xin.Research on Application of Random Source Model Based New Microtremor Survey Technology to Shield Tunnelling in Upper Soft and Lower Hard Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 43-50
[6] HUANG Zhongkai1 ZHANG Dongmei1,2.Seismic Vulnerability Analysis of the Shallow-buried Shield Tunnel in Soft Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 51-60
[7] JIANG Heng1 LIU Xuezeng2 ZHU Hehua1.Research on Crack Identification of Highway Tunnel Linings Based on Data Obtained from the Testing Vehicle[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 61-65
[8] TIAN Chongming1 YE Fei1 SONG Guifeng2 WANG Qinglong2 ZHAO Meng1.On Mechanism of Crystal Blockage of Tunnel Drainage System and Preventive Countermeasures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 66-76
[9] LIU Sicong1 ZHAO Chengqiao2 MA Chenxiao1 PENG Fangle.Discussion on Connection Problems of Underground Space in Early CBD from the Perspective of Urban Renewal ——A Case of Lujiazui CBD[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 77-83
[10] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[11] SUN Yulong YAN Zhiguo.Study on Computation of Surrounding Rock Pressure of Super Large Span and Flat Underground Cavern Based on Process Load Concept[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 91-98
[12] ZHOU Zhong CHEN Yun MIAO Linwu. Study of Equivalent Layered Method Based Prediction Model for Deformations Caused by Construction of New Tunnels Undercrossing Existing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 99-103
[13] LV Xilin1,2 ZHAO Yucheng1,2 CAI Jiantao3.Numerical Simulation of Ground Subsidence Induced by Shield Tunnel Construction Disturbance in Water-rich Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 104-109
[14] CHEN Weijie1 SU Dong1,2 CHEN Xiangsheng1,2 PANG Xiaochao2,3 LEI Guoping1,2.Study on the Influence of Coefficients of Subgrade Reaction and Lateral Pressure on Deformation of the Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 110-115
[15] LV Jingfu1 DU Jiangmei1 LUO Zejun2,3 ZHANG Jinjiang1 MIU Yabiao1.Research on the Stability and Supporting Parameters of High-Steep Slope of Yankou Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 116-124
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY