|
2020, Vol. 57(5): 239-242 DOI: | ||
Optimal Design of the Cutterhead of the Earth Pressure Balance Shield Used in Lanzhou Metro in Water-rich Sandy Cobble Stratum | ||
(1 Lanzhou Rail Transit Co., Ltd., Lanzhou 730000; 2 Lanzhou Municipal Construction Group Co., Ltd. Lanzhou 730000) | ||
Received null Revised null | ||
Supporting info | ||
|