Treatment Measures for Collapses of the Shallow-buried Highway Tunnel with Large Cross-section and Its Effects Analysis
(1 CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040; 2 CCCC Highway Bridges National Engineering Research Center Co.,Ltd., Beijing 100011; 3 Key Laboratory of Large-span Bridge Construction Technology, Ministry of Communications, Wuhan 430040;4 Research and Development Center of Intelligent Manufacturing Technologies of Transport Infrastructure of Transport Industry, Wuhan 430040)
Download: PDF (2905KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Proper treatment measures for tunnel collapse can ensure the safety of tunnel construction and effective? ly avoid the secondary collapse. Based on the background of the collapse and cave-in event at the entrance of the tunnel of Shenzhen outer ring expressway, this paper analyzes the causes of the collapse, proposes the corresponding measures to deal with the collapse, and analyzes the treatment effect of the collapse by numerical simulation and monitoring measurement. The results show that the factors like upper-hard and lower-soft stratum, poor construction quality of pipe-roof and excessive blasting cycle are the main reasons to cause the collapse and cave-in of the tunnel; it can safely pass through the collapsed area with the combination of sandbag backfilling, radial grouting of small conduit, normal grouting at working face and concrete supporting at the arch bottom.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Lin1
2 JIANG Hong1
3 CHEN Peishuai1
4 YUAN Qin1
3
KeywordsHighway tunnel   Super-large cross-section   Collapse   Treatment measures   Effect analysis     
Abstract: Proper treatment measures for tunnel collapse can ensure the safety of tunnel construction and effective? ly avoid the secondary collapse. Based on the background of the collapse and cave-in event at the entrance of the tunnel of Shenzhen outer ring expressway, this paper analyzes the causes of the collapse, proposes the corresponding measures to deal with the collapse, and analyzes the treatment effect of the collapse by numerical simulation and monitoring measurement. The results show that the factors like upper-hard and lower-soft stratum, poor construction quality of pipe-roof and excessive blasting cycle are the main reasons to cause the collapse and cave-in of the tunnel; it can safely pass through the collapsed area with the combination of sandbag backfilling, radial grouting of small conduit, normal grouting at working face and concrete supporting at the arch bottom.
KeywordsHighway tunnel,   Super-large cross-section,   Collapse,   Treatment measures,   Effect analysis     
Cite this article:   
YANG Lin1, 2 JIANG Hong1, 3 CHEN Peishuai1 etc .Treatment Measures for Collapses of the Shallow-buried Highway Tunnel with Large Cross-section and Its Effects Analysis[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 207-213
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I6/207
 
No references of article
[1] FAN Lei YANG Changyu.Study on the Evacuation and Rescue Technology for Super-long Railway Tunnels with Super-deep Shafts in Disaster Scenarios[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 1-7
[2] LIU Jianyou1 ZHAO Yong2 LV Gang1 LIU Shufen3 LIU Chunxiao1.Research on Risk Classification and Assessment Method for Tunnels Crossing under High-speed Railway Subgrade[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 8-16
[3] CHANG Yinsheng1,2 LV Le1 WANG Jingjing1,3 WANG Xudong1.Evaluation of Adjacent Building Damages Caused by Tunnel Excavation Considering Foundation Buried Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 17-24
[4] LIU Xinghong1 LIN Daming2 YU Jin3 QIU Renke4 SU Xingju4 LOU Chonghua5 WANG Hui6 ZHANG Zhongjian1.Review on BIM Technology Applied in Tunnel Engineering in China[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 25-35
[5] CAI Qingcheng.Intelligent Control Technology for the Shield Segment Prefabrication[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 36-45
[6] WEI Yinghua LIU Fei.Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 46-54
[7] JIANG Wujun1 LI Dejian2, 3 QU Tuoyu3.Upper Bound Analysis of Three-Dimensional Active Stability of a Shallow Tunnel Face Based on the Strength Reduction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 55-62
[8] XU Peng1 HUANG Jun1 ZHOU Jianbo1 TANG Jinzhou2.3D Numerical Simulation of the Interaction between Rock Mass and Shield TBM Passing through the Fault Fracture Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 63-69
[9] ZHANG Quan1 JIANG Annan1 WU Hongtao2 DUAN Longmei2.Research on Optimization of Tunnel Cyclic Advance Rate Based on Ubiquitous Joint Model[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 70-77
[10] YANG Tao.Research on the Reinforcement Optimization of the Shield Tunnel End in Water-rich Pebble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 78-85
[11] .Calculation Method and Engineering Application of Drawdown Induced by Tunnel Water Leakage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 86-92
[12] ZHANG Jiawen1,2,3 LEI Weidong1 HE Shaohui3.Analysis on the Reliability and Prediction of Residual Life of Lining Structure of the Heat Supply Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 93-100
[13] WU Zhaofeng1 HU Huirong2.Study on the Deformation and Mechanical Behaviors of the Tunnel Lining Structure Induced by High Temperature in the Fire Scenario[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 101-106
[14] ZHU Lei1 YANG Yan2 RAO Hui1 NIU Pengbo2.Analysis of Dynamic Response of Track Structure Affected by Different Degrees of Separation of the Monolithic Track Bed in Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 107-114
[15] LUO Dan.Finite Element Analysis and Parameter Optimization of the Cutterhead of Composite Shield Machines[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 115-119
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY