|
2020, Vol. 57(6): 207-213 DOI: | ||
Treatment Measures for Collapses of the Shallow-buried Highway Tunnel with Large Cross-section and Its Effects Analysis | ||
(1 CCCC Second Harbour Engineering Co., Ltd., Wuhan 430040; 2 CCCC Highway Bridges National Engineering Research Center Co.,Ltd., Beijing 100011; 3 Key Laboratory of Large-span Bridge Construction Technology, Ministry of Communications, Wuhan 430040;4 Research and Development Center of Intelligent Manufacturing Technologies of Transport Infrastructure of Transport Industry, Wuhan 430040) | ||
Received null Revised null | ||
Supporting info | ||
|