Study on Vertical Freezing Technology Applied in the Emergency Remediation of Foshan Metro Line 2 Project
(1 CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Wuhan 430040; 2 CCCC Second Harbor Engineering Company Ltd., Wuhan 430040; 3 Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040; 4 Key Laboratory of Large-span Bridge Construction Technology for Transportation Industry, Wuhan 430040; 5 Central & Southern China Municipal Engineering Design and Research Institute Co., Ltd, Wuhan 430010)
Download: PDF (2980KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the emergency remediation case of applying the vertical freezing technology in the right line of Huyong station - Lvdaohu station section of Foshan metro line 2, the numerical modeling and monitoring data analysis methods are used to systematically research the development law and application effects of the vertical frozen wall in the water-rich sand layer. The results show that it is completely feasible to isolate the hydraulic connection between undamaged and damaged tunnel sections with the vertical freezing technology. When the target ground are frozen with multiple rows of freeze pipes, the temperature of surrounding ground will influence the development of frozen walls, and the peripheral cooling rate of the frozen wall is obviously slower than that of inside the frozen wall.During freezing construction, to improve the peripheral development speed of the frozen wall, the refrigerating powers of the peripheral refrigerators should be increased and the refrigerator numbers of peripheral freezing holes can be added when necessary. It is recommended that temperature monitoring holes should be installed between the adjacent freezing pipes of the outmost row of frozen wall (the weakest point), to accurately determine the development quality and closure time of the frozen body.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Dongjun1 LIU Weijia2 XU Chao3 GAO Ruchao4 ZHAO Jingxuan5
KeywordsEmergency remediation   Numerical modeling   Vertical freezing technology   Foshan metro     
Abstract: Based on the emergency remediation case of applying the vertical freezing technology in the right line of Huyong station - Lvdaohu station section of Foshan metro line 2, the numerical modeling and monitoring data analysis methods are used to systematically research the development law and application effects of the vertical frozen wall in the water-rich sand layer. The results show that it is completely feasible to isolate the hydraulic connection between undamaged and damaged tunnel sections with the vertical freezing technology. When the target ground are frozen with multiple rows of freeze pipes, the temperature of surrounding ground will influence the development of frozen walls, and the peripheral cooling rate of the frozen wall is obviously slower than that of inside the frozen wall.During freezing construction, to improve the peripheral development speed of the frozen wall, the refrigerating powers of the peripheral refrigerators should be increased and the refrigerator numbers of peripheral freezing holes can be added when necessary. It is recommended that temperature monitoring holes should be installed between the adjacent freezing pipes of the outmost row of frozen wall (the weakest point), to accurately determine the development quality and closure time of the frozen body.
KeywordsEmergency remediation,   Numerical modeling,   Vertical freezing technology,   Foshan metro     
Cite this article:   
LIU Dongjun1 LIU Weijia2 XU Chao3 GAO Ruchao4 ZHAO Jingxuan5 .Study on Vertical Freezing Technology Applied in the Emergency Remediation of Foshan Metro Line 2 Project[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(1): 212-216
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I1/212
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY