Study on Vertical Freezing Technology Applied in the Emergency Remediation of Foshan Metro Line 2 Project
(1 CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Wuhan 430040; 2 CCCC Second Harbor Engineering Company Ltd., Wuhan 430040; 3 Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040; 4 Key Laboratory of Large-span Bridge Construction Technology for Transportation Industry, Wuhan 430040; 5 Central & Southern China Municipal Engineering Design and Research Institute Co., Ltd, Wuhan 430010)
Download: PDF (2980KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the emergency remediation case of applying the vertical freezing technology in the right line of Huyong station - Lvdaohu station section of Foshan metro line 2, the numerical modeling and monitoring data analysis methods are used to systematically research the development law and application effects of the vertical frozen wall in the water-rich sand layer. The results show that it is completely feasible to isolate the hydraulic connection between undamaged and damaged tunnel sections with the vertical freezing technology. When the target ground are frozen with multiple rows of freeze pipes, the temperature of surrounding ground will influence the development of frozen walls, and the peripheral cooling rate of the frozen wall is obviously slower than that of inside the frozen wall.During freezing construction, to improve the peripheral development speed of the frozen wall, the refrigerating powers of the peripheral refrigerators should be increased and the refrigerator numbers of peripheral freezing holes can be added when necessary. It is recommended that temperature monitoring holes should be installed between the adjacent freezing pipes of the outmost row of frozen wall (the weakest point), to accurately determine the development quality and closure time of the frozen body.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Dongjun1 LIU Weijia2 XU Chao3 GAO Ruchao4 ZHAO Jingxuan5
KeywordsEmergency remediation   Numerical modeling   Vertical freezing technology   Foshan metro     
Abstract: Based on the emergency remediation case of applying the vertical freezing technology in the right line of Huyong station - Lvdaohu station section of Foshan metro line 2, the numerical modeling and monitoring data analysis methods are used to systematically research the development law and application effects of the vertical frozen wall in the water-rich sand layer. The results show that it is completely feasible to isolate the hydraulic connection between undamaged and damaged tunnel sections with the vertical freezing technology. When the target ground are frozen with multiple rows of freeze pipes, the temperature of surrounding ground will influence the development of frozen walls, and the peripheral cooling rate of the frozen wall is obviously slower than that of inside the frozen wall.During freezing construction, to improve the peripheral development speed of the frozen wall, the refrigerating powers of the peripheral refrigerators should be increased and the refrigerator numbers of peripheral freezing holes can be added when necessary. It is recommended that temperature monitoring holes should be installed between the adjacent freezing pipes of the outmost row of frozen wall (the weakest point), to accurately determine the development quality and closure time of the frozen body.
KeywordsEmergency remediation,   Numerical modeling,   Vertical freezing technology,   Foshan metro     
Cite this article:   
LIU Dongjun1 LIU Weijia2 XU Chao3 GAO Ruchao4 ZHAO Jingxuan5 .Study on Vertical Freezing Technology Applied in the Emergency Remediation of Foshan Metro Line 2 Project[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(1): 212-216
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I1/212
 
No references of article
[1] WANG Mingnian1,2 HU Xiaoyue1,2 TANG Xiongjun3 DONG Yucang1,2 YU Li1,2.Study on Temperature Loads and Structural Internal Force Characteristics of Large-diameter Shield-driven Railway Tunnels in a Fire Scenario[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 1-9
[2] HUO Mengzhe1 LIU Xiqi1 LIN Manqing2.Mechanical Mechanism of the Shear Rock Burst in Intact Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 10-18
[3] YU Yuanxiang YAO Yao WANG Jingbin WANG Fuyu KE Da.Study on Main Controlling Factors of Surrounding Rock Stability and Support Optimization of Deep-buried Tunnels under the Coupling Action of Anchor Bolts and Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 19-26
[4] LI Linyi1 YANG Junsheng1 WANG Lichuan1,2 WANG Shuying1 FANG Xinghua1 XIE Yipeng1.Cause Analysis and Treatment Measures of the Inverted Arch Heaving Disease of a High-speed Railway Tunnel under Heavy Rainfall[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 27-36
[5] HUANG Fei1 GAO Xin2.Study on the Structural Stability of Mined Tunnels with Double-layer Initial Supporting Arch Cover in Soil-Rock Composite Strata Based on the Arch Section Constructed by CD Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 37-45
[6] MENG Yan1,2 CHENG Qifeng1,3 CHEN Xi1,2 WU Wanxia1,2 HUANG Yichun1,2.Research Progress in the Porous Media Grouting Simulation Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 46-53
[7] YANG Jihua1 GUO Weixin1 YAN Changbin2 MIAO Dong1.Study on Optimization of TBM Driving Parameters Based on the Energy Consumption[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 54-60
[8] CHEN Fudong1 LEI Mingfeng1 ZHENG Bangyou2 WU Zhigang2 YAO Yu2.Study on Optimization of Design Parameters of One-sided Water Stopping Curtain Based on the Orthogonal Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 61-66
[9] JIANG Pin LI Yuanfu.Study on Risk Assessment in Subway Station Construction Based on Principal Component Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 67-74
[10] ZHOU Shengshi ZHANG Ning ZHANG Xiaojuan.Metro Construction Risk Assessment Based on PPC-D-S Evidence Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 75-83
[11] HAN Xingbo1,2 XIA Yongxu1 WANG Wenbing3 CHAI Lunlei1 WANG Xing1.Study on the Safety Risk Criterion for Personnel Escape in Highway Tunnel Fires under the Concept of Life Value and Injury Value[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 84-91
[12] FANG Youliang1 SONG Shangming1 SHANG Haisong2 ZHOU Jibing2.Research on Digital Project Management and Control Platform of Construction Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 92-98
[13] WEN Ming1,2 ZHANG Dingli2 FANG Huangcheng2 YU Fucai1 LIU Yan1.Optimization Analysis on Spatial Variability of Tunnel Surrounding Rock Parameters Based on Constrained Random Field Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 99-108
[14] ZHANG Fengrui1 JIANG Annan1 ZHAO Liang2 CHEN Wei2 GUO Kuo2.Study on Time Series Prediction of the Tunnel Deformation Based on the Multivariable GP-DE Model[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 109-116
[15] WANG Junxiang1 XU Chenhui1 DONG Jianhua2 CHEN Sili1 KOU Haijun3 WANG Xin1.Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 117-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY