现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(1): 212-216    DOI:
Study on Vertical Freezing Technology Applied in the Emergency Remediation of Foshan Metro Line 2 Project
(1 CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Wuhan 430040; 2 CCCC Second Harbor Engineering Company Ltd., Wuhan 430040; 3 Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040; 4 Key Laboratory of Large-span Bridge Construction Technology for Transportation Industry, Wuhan 430040; 5 Central & Southern China Municipal Engineering Design and Research Institute Co., Ltd, Wuhan 430010)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn