Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :86-92    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer
(1 School of Civil Engineering, Guangxi University, Nanning 530004; 2 Key Laboratory of Engineering Disaster Prevention and Structural Safety, Ministry of Education, Nanning 530004; 3 China Railway No.10 Engineering Group Co., Ltd., Jinan 250101)
Download: PDF (3690KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The large ground surface heaving in front of the cutting face during the pipe jacking is studied on the ba? sis of a large-section rectangular jacking pipe works at the entrance/exit of a subway station in Ningbo. The monitored data of ground surface deformation in the whole pipe jacking process are analyzed in combination with the jacking situation on the site. Moreover, PLAXIS finite element software is used to simulate pipe jacking under different jacking forces and without soil reinforcement, and the simulated results are compared and analyzed with the monitored data. The analysis results show that the large ground surface heaving can be generated due to excessive jacking force, and vice versa; the jet grouting piles used for reinforcing the entrances/exits area adjacent to the structure have no desirable effect, and it could cause the ground surface heaving at the beginning of jacking. The ground surface heaves rapidly when the pipe jacking and extruding in the soft soil layer, but subsides slowly after the jacking face passing. So, special attention should be paid during the construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WU Bo1
2 PENG Yiyong1
2 MENG Guowang1
2 PU Songquan3
KeywordsSoft soil layer   Rectangular jacking pipe   Jacking force   Deformation   Ground surface heaving   Moni? tored data   Finite element analysis     
Abstract: The large ground surface heaving in front of the cutting face during the pipe jacking is studied on the ba? sis of a large-section rectangular jacking pipe works at the entrance/exit of a subway station in Ningbo. The monitored data of ground surface deformation in the whole pipe jacking process are analyzed in combination with the jacking situation on the site. Moreover, PLAXIS finite element software is used to simulate pipe jacking under different jacking forces and without soil reinforcement, and the simulated results are compared and analyzed with the monitored data. The analysis results show that the large ground surface heaving can be generated due to excessive jacking force, and vice versa; the jet grouting piles used for reinforcing the entrances/exits area adjacent to the structure have no desirable effect, and it could cause the ground surface heaving at the beginning of jacking. The ground surface heaves rapidly when the pipe jacking and extruding in the soft soil layer, but subsides slowly after the jacking face passing. So, special attention should be paid during the construction.
KeywordsSoft soil layer,   Rectangular jacking pipe,   Jacking force,   Deformation,   Ground surface heaving,   Moni? tored data,   Finite element analysis     
Cite this article:   
WU Bo1, 2 PENG Yiyong1, 2 MENG Guowang1 etc .Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 86-92
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/86
 
No references of article
[1] YU Jie.Study on Reasonable Construction Method for Tunnels in Contact Zone of Red Clay and Sandstone Interbedded with Mudstone[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 174-181
[2] WU Jiancheng.Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 145-150
[3] LEI Shengxiang1 WANG Fei2 YU Jie2 SHAO Shengjun3 LIANG Qingguo4.Discussion on the Technological Development of Loess Tunnelling in the Future[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 1-7
[4] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[5] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[6] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[7] XU Xueliang1,2 MA Weibin1,2 CAI Degou1,2 AN Zheli1,2 CHAI Jinfei1,2.Research on Full-Life-Cycle Inspection and Monitoring System of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 31-40
[8] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[9] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[10] ZHANG Ziguang1 CAO Guangyong1,2 LI Jianli3 ZHAI Chaojiao1,2.Research on Safe Thickness of Overlying Rock Layer above Subway Tunnels in Upper-soft and Lower-hard Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 71-77
[11] WEN Xu1 PEI Xiangjun1 PEI Zuan1 YANG Hailong1 CHEN Zhenlin1 ZHANG Yichen2.Study on Structural Design and Safety of Shed Tunnels in the Scenic Area of Changbai Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 151-157
[12] HU Changming1,2 LI Liang1 MEI Yuan1,2 YUAN Yili1 WANG Zhiyu1.Global Sensitivity Analysis on Parameters of the Prediction Model for Shield Vertical Attitude[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 127-134
[13] GAO Xin WANG Wenjuan.Research on Reasonable Combination Forms and Mechanical Deformation Characteristics of Double-layer Superimposed Lining in Deep-buried Tunnels under the Action of Far-field Hydrostatic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 93-102
[14] YU Hongping1 SU Peidong2 ZHAO Tianbiao3 CHEN Dejun1 XU Xueyuan1 DU Yuben1.Study on Sources and Hazards of Crude Oil and Harmful Gases in Huangjialiang Tunnel on Xi′an-Chengdu Passenger Dedicated Line[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 182-187
[15] FAN Yanbo1, 2 CHEN Li3 SHI Jiangwei1, 2 DING Chu1, 2 ZHANG Xian1, 2.Study on Deformation Mechanism of the Underlying Tunnel Caused by Excavation of the Deep Foundation Pit in Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 103-110
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY