|
2021, Vol. 58(2): 86-92 DOI: | ||
Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer | ||
(1 School of Civil Engineering, Guangxi University, Nanning 530004; 2 Key Laboratory of Engineering Disaster Prevention and Structural Safety, Ministry of Education, Nanning 530004; 3 China Railway No.10 Engineering Group Co., Ltd., Jinan 250101) | ||
Received null Revised null | ||
Supporting info | ||
|