Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :208-213    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
On Transfer Technology of D&B Construction Method and Shield Construction Method at the Interface of a Subsea Tunnel and Its Application
(1 China Railway Liuyuan Group Co., Ltd., Tianjin 300131; 2 China Railway First Bureau Group Co., Ltd., Xi′an 710100)
Download: PDF (4532KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As for the running tunnel section between Wuyuanwan station-Liuwudian station of Xiamen metro line 3, the construction method of " dismantling shield machine in the subsea and continually excavating the rest of section by the D&B method" is adopted. It is required to overcome such technical difficulties as shield disintegration in a confined space, long-distance single-line transportation, long-distance blind ventilation, protection of formed segments, waterproofing of joint structures, etc. The paper systematically expounds the transfer technology of various construction methods in Wuyuanwan station - Liuwudian station section and mainly introduces the solutions to the above construction difficulties. It has been proved in practice that this technology can greatly improve the construction progress under the premise of guaranteeing construction safety and structural function completeness, having reference significance for the subsea tunnel constructed by multiple combined methods.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DU Baoyi1 SONG Chaoye1 HE Weiguo1 LI Kai 2
KeywordsSubsea tunnel   Transfer of construction methods   Shield machine disintegration   D&B tunnel   Controlled blasting     
Abstract: As for the running tunnel section between Wuyuanwan station-Liuwudian station of Xiamen metro line 3, the construction method of " dismantling shield machine in the subsea and continually excavating the rest of section by the D&B method" is adopted. It is required to overcome such technical difficulties as shield disintegration in a confined space, long-distance single-line transportation, long-distance blind ventilation, protection of formed segments, waterproofing of joint structures, etc. The paper systematically expounds the transfer technology of various construction methods in Wuyuanwan station - Liuwudian station section and mainly introduces the solutions to the above construction difficulties. It has been proved in practice that this technology can greatly improve the construction progress under the premise of guaranteeing construction safety and structural function completeness, having reference significance for the subsea tunnel constructed by multiple combined methods.
KeywordsSubsea tunnel,   Transfer of construction methods,   Shield machine disintegration,   D&B tunnel,   Controlled blasting     
Cite this article:   
DU Baoyi1 SONG Chaoye1 HE Weiguo1 LI Kai 2 .On Transfer Technology of D&B Construction Method and Shield Construction Method at the Interface of a Subsea Tunnel and Its Application[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 208-213
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/208
 
No references of article
[1] YU Jie.Study on Reasonable Construction Method for Tunnels in Contact Zone of Red Clay and Sandstone Interbedded with Mudstone[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 174-181
[2] WU Jiancheng.Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 145-150
[3] LEI Shengxiang1 WANG Fei2 YU Jie2 SHAO Shengjun3 LIANG Qingguo4.Discussion on the Technological Development of Loess Tunnelling in the Future[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 1-7
[4] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[5] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[6] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[7] XU Xueliang1,2 MA Weibin1,2 CAI Degou1,2 AN Zheli1,2 CHAI Jinfei1,2.Research on Full-Life-Cycle Inspection and Monitoring System of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 31-40
[8] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[9] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[10] ZHANG Ziguang1 CAO Guangyong1,2 LI Jianli3 ZHAI Chaojiao1,2.Research on Safe Thickness of Overlying Rock Layer above Subway Tunnels in Upper-soft and Lower-hard Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 71-77
[11] WEN Xu1 PEI Xiangjun1 PEI Zuan1 YANG Hailong1 CHEN Zhenlin1 ZHANG Yichen2.Study on Structural Design and Safety of Shed Tunnels in the Scenic Area of Changbai Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 151-157
[12] WU Bo1,2 PENG Yiyong1,2 MENG Guowang1,2 PU Songquan3.Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 86-92
[13] HU Changming1,2 LI Liang1 MEI Yuan1,2 YUAN Yili1 WANG Zhiyu1.Global Sensitivity Analysis on Parameters of the Prediction Model for Shield Vertical Attitude[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 127-134
[14] GAO Xin WANG Wenjuan.Research on Reasonable Combination Forms and Mechanical Deformation Characteristics of Double-layer Superimposed Lining in Deep-buried Tunnels under the Action of Far-field Hydrostatic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 93-102
[15] YU Hongping1 SU Peidong2 ZHAO Tianbiao3 CHEN Dejun1 XU Xueyuan1 DU Yuben1.Study on Sources and Hazards of Crude Oil and Harmful Gases in Huangjialiang Tunnel on Xi′an-Chengdu Passenger Dedicated Line[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 182-187
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY