现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2021, Vol. 58(2): 208-213    DOI:
On Transfer Technology of D&B Construction Method and Shield Construction Method at the Interface of a Subsea Tunnel and Its Application
(1 China Railway Liuyuan Group Co., Ltd., Tianjin 300131; 2 China Railway First Bureau Group Co., Ltd., Xi′an 710100)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn