|
2021, Vol. 58(2): 208-213 DOI: | ||
On Transfer Technology of D&B Construction Method and Shield Construction Method at the Interface of a Subsea Tunnel and Its Application | ||
(1 China Railway Liuyuan Group Co., Ltd., Tianjin 300131; 2 China Railway First Bureau Group Co., Ltd., Xi′an 710100) | ||
Received null Revised null | ||
Supporting info | ||
|