Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (4) :117-124    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance
(1 CCCC First Highway Consultants Co., Ltd., Xi′an 710075; 2 School of Civil Engineering, Xi′an University of Architecture and Technology, Xi′an 710055)
Download: PDF (3411KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Taking the intercity rail project from Xi′an North Station to Xianyang Airport as an example, this paper analyzes the impact of the adjacent parallel construction of new tunnels on the existing tunnels through finite element software ANSYS, regarding two construction options of "left bore first before right bore" and "right bore first before left bore". It is mainly focused on the influence patterns of such factors as the ground loss rate, shield thrust and grouting during shield construction. The results show that the option of "left bore first before right bore" has less effect on the ground displacement as well as the stress and strain of the existing tunnel segments; with smaller ground loss rate; the smaller the ground settlement is, the smaller the maximum ground settlement will be, and the flatter the ground settlement slope will be; the greater the shield thrust is, the greater the ground settlement will be,and as the shield excavation distance extends, the ground settlement will gradually decrease until it tends to stabilize; the higher the elasticity modulus of the grouting materials is, the lower the amount of ground settlement will be.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2
KeywordsClose distance   Shield tunnel   Construction process   Numerical simulation     
Abstract: Taking the intercity rail project from Xi′an North Station to Xianyang Airport as an example, this paper analyzes the impact of the adjacent parallel construction of new tunnels on the existing tunnels through finite element software ANSYS, regarding two construction options of "left bore first before right bore" and "right bore first before left bore". It is mainly focused on the influence patterns of such factors as the ground loss rate, shield thrust and grouting during shield construction. The results show that the option of "left bore first before right bore" has less effect on the ground displacement as well as the stress and strain of the existing tunnel segments; with smaller ground loss rate; the smaller the ground settlement is, the smaller the maximum ground settlement will be, and the flatter the ground settlement slope will be; the greater the shield thrust is, the greater the ground settlement will be,and as the shield excavation distance extends, the ground settlement will gradually decrease until it tends to stabilize; the higher the elasticity modulus of the grouting materials is, the lower the amount of ground settlement will be.
KeywordsClose distance,   Shield tunnel,   Construction process,   Numerical simulation     
Cite this article:   
WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2 .Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 117-124
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/117
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[8] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[9] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[10] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[11] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[12] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[13] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[14] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
[15] YAN Haojie ZHENG Junjie PAN Yu CHEN Pengfei.Time-Space Effect of Pile Foundation Responses Induced by Adjacent Shield Tunnel Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 133-140
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY