|
2021, Vol. 58(4): 117-124 DOI: | ||
Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance | ||
(1 CCCC First Highway Consultants Co., Ltd., Xi′an 710075; 2 School of Civil Engineering, Xi′an University of Architecture and Technology, Xi′an 710055) | ||
Received null Revised null | ||
Supporting info | ||
|