Analysis of Construction Control Parameters in Rock Shield-driven Tunnelling
(1 The Fourth Engineering Co., Ltd, of China Railway No.9 Engineering Group Co., Ltd., Liaoning 110000; 2 Railway Noise and Vibration Environment Engineering Research Center of the Ministry of Education, East China Jiaotong University, Jiangxi 330013;3 National Demonstration Center for Experimental Civil Engineering Education, East China Jiaotong University, Nanchang, Jiangxi 330013)
Download: PDF (2286KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract There are many factors influencing the construction parameters in shield tunnelling, and regarding the re? search on correlation among the construction parameters in shield tunnelling it is mainly based on theoretical analysis. It is difficult to clarify the influencing factors and mechanism of the construction parameters in shield tunnelling. This paper collects and analyzes the construction control parameters during EPB shield tunnelling in rock strata in Dalian, and the results show that: the correlation between the total thrust and advancing speed, the cutterhead rotation speed and torque, and the screw conveyor rotation speed and torque are all not significant; due to the significant soil arch effect in rock strata and thus the low frictional resistance between the shield shell and the surrounding rock, the total thrust is mainly used to provide the horizontal interaction between the cutterhead and the excavation face; the correlation between the rotation speed of the screw conveyor and the advancing speed of the shield machine is significant; the screw conveyor controls the fullness of the soil chamber through the rotation speed, influencing the excavated soils entering the chamber, so the muck discharge efficiency of the screw conveyor has a significant effect on the advancing speed and cutterhead torque.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YIN Sujiang1 YAN Shishun1 PEI Baizheng1 HUANG Dawei2
3
KeywordsShield tunnel   Rock strata   Construction control parameters     
Abstract: There are many factors influencing the construction parameters in shield tunnelling, and regarding the re? search on correlation among the construction parameters in shield tunnelling it is mainly based on theoretical analysis. It is difficult to clarify the influencing factors and mechanism of the construction parameters in shield tunnelling. This paper collects and analyzes the construction control parameters during EPB shield tunnelling in rock strata in Dalian, and the results show that: the correlation between the total thrust and advancing speed, the cutterhead rotation speed and torque, and the screw conveyor rotation speed and torque are all not significant; due to the significant soil arch effect in rock strata and thus the low frictional resistance between the shield shell and the surrounding rock, the total thrust is mainly used to provide the horizontal interaction between the cutterhead and the excavation face; the correlation between the rotation speed of the screw conveyor and the advancing speed of the shield machine is significant; the screw conveyor controls the fullness of the soil chamber through the rotation speed, influencing the excavated soils entering the chamber, so the muck discharge efficiency of the screw conveyor has a significant effect on the advancing speed and cutterhead torque.
KeywordsShield tunnel,   Rock strata,   Construction control parameters     
Cite this article:   
YIN Sujiang1 YAN Shishun1 PEI Baizheng1 HUANG Dawei2, 3 .Analysis of Construction Control Parameters in Rock Shield-driven Tunnelling[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 218-223
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/218
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[8] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[9] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[10] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[11] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[12] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[13] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[14] WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2.Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 117-124
[15] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY