|
2021, Vol. 58(4): 218-223 DOI: | ||
Analysis of Construction Control Parameters in Rock Shield-driven Tunnelling | ||
(1 The Fourth Engineering Co., Ltd, of China Railway No.9 Engineering Group Co., Ltd., Liaoning 110000; 2 Railway Noise and Vibration Environment Engineering Research Center of the Ministry of Education, East China Jiaotong University, Jiangxi 330013;3 National Demonstration Center for Experimental Civil Engineering Education, East China Jiaotong University, Nanchang, Jiangxi 330013) | ||
Received null Revised null | ||
Supporting info | ||
|