Experimental Study on Caulking Treatment Against Water Leakage in Shield Tunnel Segment Joints
(1 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2 Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, Tongji University, Shanghai 200092; 3 CCCC Second Highway Consultants Co., Ltd., Wuhan 430056)
Download: PDF (2195KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To explore the effect and applicability of the caulking treatment measures against water leakage in shield tunnel segment joints, investigation and statistics are carried out on the segment water leakage conditions in a shield tunnel project in China. And with prepared concrete specimens the three-dimensional water pressure loading test system independently developed by Tongji University is used to carry out multiple sets of laboratory experimental study on the caulking and sealing method — the water leakage treatment measure actually used in the project.The results show that: (1) using the EPDM caulking and sealing gasket to treat the water leakage in segment joints, it can meet the requirements for Class I water-proofing. When the opening is 3 mm and the dislocation is 0 mm, it has a waterproof capacity of 0.38 MPa. When the dislocation is large, optimization design needs to be made for the section structure of the sealing gasket; (2) the sealing performance of the segment joint has obvious influence on the treatment effect of the caulking and sealing method, and water leakage is more likely to occur at positions where the caulking and sealing gasket is extruded out in the extrusion process and the sealing performance of the segment joint is poor.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Yi1
2 DING Wenqi1
2 YANG Linsong3 XIE Dongwu1
2
KeywordsShield tunnel   Segment joint   Water leakage   Caulking treatment   Waterproof test   EPDM sealing gas? ket     
Abstract: To explore the effect and applicability of the caulking treatment measures against water leakage in shield tunnel segment joints, investigation and statistics are carried out on the segment water leakage conditions in a shield tunnel project in China. And with prepared concrete specimens the three-dimensional water pressure loading test system independently developed by Tongji University is used to carry out multiple sets of laboratory experimental study on the caulking and sealing method — the water leakage treatment measure actually used in the project.The results show that: (1) using the EPDM caulking and sealing gasket to treat the water leakage in segment joints, it can meet the requirements for Class I water-proofing. When the opening is 3 mm and the dislocation is 0 mm, it has a waterproof capacity of 0.38 MPa. When the dislocation is large, optimization design needs to be made for the section structure of the sealing gasket; (2) the sealing performance of the segment joint has obvious influence on the treatment effect of the caulking and sealing method, and water leakage is more likely to occur at positions where the caulking and sealing gasket is extruded out in the extrusion process and the sealing performance of the segment joint is poor.
KeywordsShield tunnel,   Segment joint,   Water leakage,   Caulking treatment,   Waterproof test,   EPDM sealing gas? ket     
Cite this article:   
LI Yi1, 2 DING Wenqi1, 2 YANG Linsong3 XIE Dongwu1 etc .Experimental Study on Caulking Treatment Against Water Leakage in Shield Tunnel Segment Joints[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 167-172
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I5/167
 
No references of article
[1] WEI Gang1,2 ZHAO Deqianlin1 HUANG Rui1.A Review of Model Test Studies on the Impact of Shield Construction on Adjacent Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 1-8
[2] DING Zhi1,2 HE Chenyang1 ZHANG Xiao1 ZHANG Wenhong3 WU Sheng4.An Outlook for Researches on the Impact and Control Technology of Shield Construction in Gassy Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 9-20
[3] ZHANG Longguan1 LIU Suimei1 LI Kaifu1 XU Jin2,3,4 WANG Shengnan3,5 LI Qiang3.Prediction of Shield Construction Risks in Subway Tunnelling Based on Fault Tree and Bayesian Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 21-29
[4] ZHENG Bo1,2 WU Jian1,2 ZHENG Jinlong3 KUANG Liang4 GUO Rui1,2.Study on Anti-Freezing Parameters of High-Altitude Tunnels in Western Sichuan Based on Field Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 30-36
[5] QIU Wenge WAN Shifu GAO Ganggang ZHAO Hailin QI Xingxin.tudy on the Control Measures against Ground Settlement Induced by Shield Tunnel Construction underneath Railway Throat in Sandy Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 37-45
[6] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[7] GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi.Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 56-64
[8] LI Siming1 YU Haitao2 XUE Guangqiao3 XU Lei4.Analysis on Seismic Response of Shield Tunnels Passing Through Soil-Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 65-72
[9] CHANG Gang1,2 PAI Lifang3,4 PANG Weijun1,4 WU Honggang1,2,4 YAN Lizhen1.Study on the Effect on Deformation of the Surrounding Rock Induced by DeepBuried Tunnelling under Hard Rock Combination Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 73-77
[10] CHEN Yukun1 GUAN Huisheng1 ZHOU Lei2 LIU Cheng1.Research on the Wear Prediction of Disc Cutters Based on BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 78-84
[11] SONG Yang1 WANG Weiyi2 DU Chunsheng3.On Parameter Optimization for a Slurry Shield Approaching Construction under Existing Subway Tunnels in Water-Rich Pebble and Mudstone Composite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 85-95
[12] XU Youjun1,2 HUANG Zhengdong1,2 ZHANG Xu1,2 ZHANG Chao1,2 KANG Jiawang1,2 ZHOU Wei1.Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 96-103
[13] PAN Weiqiang1 JIAO Bochang2 LIU Xian2 ZENG Hua3 JI Maojie3.Field Test Research on the Contact Pressure and Stress Characteristics of Jacked Steel Pipes with Deep-buried Depth and Large-section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 104-113
[14] CHEN Zhiying NIU Guoqing WANG Shumeng GUO Chenwei.Study of the Optimization of Air Curtain Parameters in Tunnelling Based on Orthogonal Simulation Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 114-121
[15] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY