Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (5) :221-226    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research, Development and Application of an Intelligent Grooving Robot System for Defect Remediation in Existing Railway Tunnels
(1 Sichuan Laboratory for Robot Application Technology Engineering in Equipment Manufacturing, Deyang 618000; 2 CREGC Fifth Engineering Company, Chengdu 610091)
Download: PDF (2722KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to solve the problems of high labor intensity, low construction efficiency and low degree of auto? mation in terms of manual grooving operation during water seepage treatment in existing railway tunnels, this paper develops an intelligent grooving robot system based on the design concept of informationization and intelligence and in combination with the construction process of tunnel defect remediation. The system uses railway flat cars as the mobile carrier and has the functions of tunnel section scanning, model reconstruction, automatic planning of robot motion trajectory, flexibly cutting groove with shape under constant force control, real-time monitoring of system status and automatic dust removal and temperature reduction, etc. It can adapt to the wet and leaky environment in tunnels and has been successfully verified through application in the second subsection of the JLDH-1 lot of JiaozuoLiuzhou Railway electrication renovation project. The results show that the system can realize the informationization and intelligence of grooving operation in railway tunnels, improve the construction efficiency and reduce the labor intensity of workers.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SHI Yun1 YANG Lingwu2 HU Minghua1 LEI Gang1 TANG Hao2
KeywordsTunnel seepage   Defect remediation   Intelligent grooving robot   Scanning and model reconstruction of tunnel section   Automatic control     
Abstract: In order to solve the problems of high labor intensity, low construction efficiency and low degree of auto? mation in terms of manual grooving operation during water seepage treatment in existing railway tunnels, this paper develops an intelligent grooving robot system based on the design concept of informationization and intelligence and in combination with the construction process of tunnel defect remediation. The system uses railway flat cars as the mobile carrier and has the functions of tunnel section scanning, model reconstruction, automatic planning of robot motion trajectory, flexibly cutting groove with shape under constant force control, real-time monitoring of system status and automatic dust removal and temperature reduction, etc. It can adapt to the wet and leaky environment in tunnels and has been successfully verified through application in the second subsection of the JLDH-1 lot of JiaozuoLiuzhou Railway electrication renovation project. The results show that the system can realize the informationization and intelligence of grooving operation in railway tunnels, improve the construction efficiency and reduce the labor intensity of workers.
KeywordsTunnel seepage,   Defect remediation,   Intelligent grooving robot,   Scanning and model reconstruction of tunnel section,   Automatic control     
Cite this article:   
SHI Yun1 YANG Lingwu2 HU Minghua1 LEI Gang1 TANG Hao2 .Research, Development and Application of an Intelligent Grooving Robot System for Defect Remediation in Existing Railway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 221-226
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I5/221
 
No references of article
[1] WEI Gang1,2 ZHAO Deqianlin1 HUANG Rui1.A Review of Model Test Studies on the Impact of Shield Construction on Adjacent Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 1-8
[2] DING Zhi1,2 HE Chenyang1 ZHANG Xiao1 ZHANG Wenhong3 WU Sheng4.An Outlook for Researches on the Impact and Control Technology of Shield Construction in Gassy Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 9-20
[3] ZHANG Longguan1 LIU Suimei1 LI Kaifu1 XU Jin2,3,4 WANG Shengnan3,5 LI Qiang3.Prediction of Shield Construction Risks in Subway Tunnelling Based on Fault Tree and Bayesian Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 21-29
[4] ZHENG Bo1,2 WU Jian1,2 ZHENG Jinlong3 KUANG Liang4 GUO Rui1,2.Study on Anti-Freezing Parameters of High-Altitude Tunnels in Western Sichuan Based on Field Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 30-36
[5] QIU Wenge WAN Shifu GAO Ganggang ZHAO Hailin QI Xingxin.tudy on the Control Measures against Ground Settlement Induced by Shield Tunnel Construction underneath Railway Throat in Sandy Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 37-45
[6] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[7] GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi.Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 56-64
[8] LI Siming1 YU Haitao2 XUE Guangqiao3 XU Lei4.Analysis on Seismic Response of Shield Tunnels Passing Through Soil-Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 65-72
[9] CHANG Gang1,2 PAI Lifang3,4 PANG Weijun1,4 WU Honggang1,2,4 YAN Lizhen1.Study on the Effect on Deformation of the Surrounding Rock Induced by DeepBuried Tunnelling under Hard Rock Combination Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 73-77
[10] CHEN Yukun1 GUAN Huisheng1 ZHOU Lei2 LIU Cheng1.Research on the Wear Prediction of Disc Cutters Based on BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 78-84
[11] SONG Yang1 WANG Weiyi2 DU Chunsheng3.On Parameter Optimization for a Slurry Shield Approaching Construction under Existing Subway Tunnels in Water-Rich Pebble and Mudstone Composite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 85-95
[12] XU Youjun1,2 HUANG Zhengdong1,2 ZHANG Xu1,2 ZHANG Chao1,2 KANG Jiawang1,2 ZHOU Wei1.Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 96-103
[13] PAN Weiqiang1 JIAO Bochang2 LIU Xian2 ZENG Hua3 JI Maojie3.Field Test Research on the Contact Pressure and Stress Characteristics of Jacked Steel Pipes with Deep-buried Depth and Large-section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 104-113
[14] CHEN Zhiying NIU Guoqing WANG Shumeng GUO Chenwei.Study of the Optimization of Air Curtain Parameters in Tunnelling Based on Orthogonal Simulation Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 114-121
[15] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY