Study on Safety Control of Adjacent Construction of Overlapped Shield Tunnel with a Small Radius of Curve
(1. Beijing Municipal Construction Group Co., Ltd., Beijing 100048; 2. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 3. Academicians and Experts Workstation of Mine Safety and Underground Engineering,Inner Mongolia University of Science and Technology, Baotou 014010; 4. Technical Research Center for Urban Underground Engineering of Colleges and Universities in the Inner Mongolia Autonomous Region, Baotou 014010)
Download: PDF (5726KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The risk of the adjacent construction of overlapped shield tunnel with a small radius of curve is relatively high, so its safety control is of great importance in the industry. Based on the case of an overlapped shield tunnel project, the feasibility of control measures such as interlayer soil grouting, erection of internal steel supports, etc.was studied through numerical simulation, and a reasonable control scheme was proposed accordingly. In addition,the effect of safety control was evaluated according to the data of on-site monitoring. The study results showed that,compared with the scheme without reinforcement measures, the reinforcement through interlayer soil grouting could increase the strength of interlayer soil and effectively reduce the floating of segments, while the erection of internal steel supports were could reduce the horizontal deformation of segments. The combination of these two schemes could effectively maintain the shape of the section, and the maximum values of vertical deformation of segment crown and convergence deformation of horizontal clearance were 7.02 mm and 2.74 mm respectively, both of which were less than the standard value of deformation control. Therefore, the combined use of interlayer soil grouting and erection of internal steel supports on site was reasonable and feasible.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Lili1 SHAN Lin1 GUO Fei1 CAI Zhen1 HAN Ruilin1 ZHANG Xu2
3
4 WANG Zhiguang2 XU Youjun2
3
4
KeywordsOverlapped shield tunnel   Small radius of curve   Adjacent construction   Safety control   Grouting in inter? layer soil   Profile steel support     
Abstract: The risk of the adjacent construction of overlapped shield tunnel with a small radius of curve is relatively high, so its safety control is of great importance in the industry. Based on the case of an overlapped shield tunnel project, the feasibility of control measures such as interlayer soil grouting, erection of internal steel supports, etc.was studied through numerical simulation, and a reasonable control scheme was proposed accordingly. In addition,the effect of safety control was evaluated according to the data of on-site monitoring. The study results showed that,compared with the scheme without reinforcement measures, the reinforcement through interlayer soil grouting could increase the strength of interlayer soil and effectively reduce the floating of segments, while the erection of internal steel supports were could reduce the horizontal deformation of segments. The combination of these two schemes could effectively maintain the shape of the section, and the maximum values of vertical deformation of segment crown and convergence deformation of horizontal clearance were 7.02 mm and 2.74 mm respectively, both of which were less than the standard value of deformation control. Therefore, the combined use of interlayer soil grouting and erection of internal steel supports on site was reasonable and feasible.
KeywordsOverlapped shield tunnel,   Small radius of curve,   Adjacent construction,   Safety control,   Grouting in inter? layer soil,   Profile steel support     
Cite this article:   
ZHANG Lili1 SHAN Lin1 GUO Fei1 CAI Zhen1 HAN Ruilin1 ZHANG Xu2, 3, 4 WANG Zhiguang2 XU Youjun2 etc .Study on Safety Control of Adjacent Construction of Overlapped Shield Tunnel with a Small Radius of Curve[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 253-264
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I3/253
 
No references of article
[1] LIANG Erbin.Study of the Settlement Control of Deformation Joints of Tunnels Passing Closely under the Existing Station[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 182-191
[2] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[3] CHEN Zhuo1,2 KONG Chao3.Study on the Influence of the Construction of Large-section Metro Station on Lateral Friction Resistance of Adjacent Pile Foundation[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 114-120
[4] ZHANG Junru YE Lun YAN Congwen LIU Dingding CUI Yao FENG Jimeng.Study on the Influence of Approaching Construction of the Trailing Shielddriven Tunnel on the Large-section Mined Tunnel in Argillaceous Siltstone Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 122-132
[5] LI Junjie.Influence on Deformation and Control Measures: A Case Study of Bored Running Tunnel Construction Adjacent to Existing Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 168-174
[6] LIANG Xiao-Yong- Jin- Jing- Zhang-Chun-Hui.On Characteristics of Displacements Induced by Approaching Metro Tunnel Construction in a Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 110-115
[7] LAI Hong-Peng-1, 2 , TI Jia-Feng-3, ZHANG Hong-Guang-1, XIE Yong-Li-1.Shallow-Buried Large-Section Soil Tunnel Passing Under the Great Wall of the Ming Dynasty[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(1): 190-196
[8] WANG Jian-Chen, ZHANG Ding-Li, ZHANG Cheng-Ping, SU JIE , TAI Qi-Min.Dynamic Back-Analysis and Prediction of Overlying Subway Station Displacement Induced by Approaching Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(4): 58-66
[9] LIU Xue-Yan-1, 2 , Yuan-Da-Jun-1, 2 , Qiao-Guo-Gang-3, Wang, FEI 1, 2 , Chen-Hai-Feng-4.Safe Shield Tunnelling Under Buildings [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 147-151
[10] Kong Chao Qiu Wenge Zhang Huijian Man Shuai.A Study of the Rock Mass Stability of a Tunnel Group Based on Numerical Limit Analysis[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(6): 66-71
[11] Lü Xianghong Yang Dongmei Zheng Qing.Construction Techniques for a Shield Tunnel Passing Under an Existing Metro Tunnel in Cobble Stratum  [J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(5): 152-157
[12] Zheng Yuchao Li Hui.Application of ANP-FE and Numerical Simulation in the Risk Assessment
and Management of a Subway Tunnel During Adjacent Excavation
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(3): 24-31
[13] Cheng Gang1 Chen Guihong2.Discussion of and Solutions for the Effects of a Newly-Built Highway Tunnel on an Existing Railway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(2): 139-144
[14] JI Xiao-Ming-1, TANG Wei-Cai-1, TAN Wen-2, WANG Bing-Hua-3.Study of Key Construction Technologies for Multiple Closely Spaced Tunnels in an Urban Area[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(6): 23-31
[15] LUO Wei.
Safety Measures for Shield Tunnel Construction
[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(2): 15-20
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY