Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (4) :218-225    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Design and Analysis of the Tunnel Section at Railway Station Crossing Under the Pile Foundation
 
(1. Hunan Provincial Communications Planning, Survey & Design Institute Co., Ltd., Changsha 410200; 2. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3. China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043)
Download: PDF (4909KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Guide  
Abstract Based on the case of the Large-span Tunnel Section at Longdongbao Airport Station (Guiyang Railway Hub) crossing under the airport viaduct and the theory of punching shear failure cone of rock mass, the method for determining the minimum rock slab thickness that meets the pile foundation stress requirement was put forward by using theoretical analysis, numerical simulation and field measurement; the standard for dividing the tunnel-pile foundation proximity relationship was established, in which the surrounding rock disturbance range of tunnel excavation and the range of punching shear failure of pile foundation were considered; and the viaduct settlement control standard and design countermeasures were proposed and the measured data were used for verification. The results show that the zone of influence of the tunnel crossing under the file foundation is reasonably divided, the design countermeasures can effectively control the impact of tunnel excavation on the viaduct, and meanwhile, the impact of pile foundation on the tunnel can be controlled.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Xiong1 MENG Qinghui2 LI Pin1 XU Dengfei3 CAO Feng1
KeywordsTunnel project   Tunnel crossing under the pile foundation   Surrounding rock stability   Proximate zone of influence   Settlement control standard     
Abstract: Based on the case of the Large-span Tunnel Section at Longdongbao Airport Station (Guiyang Railway Hub) crossing under the airport viaduct and the theory of punching shear failure cone of rock mass, the method for determining the minimum rock slab thickness that meets the pile foundation stress requirement was put forward by using theoretical analysis, numerical simulation and field measurement; the standard for dividing the tunnel-pile foundation proximity relationship was established, in which the surrounding rock disturbance range of tunnel excavation and the range of punching shear failure of pile foundation were considered; and the viaduct settlement control standard and design countermeasures were proposed and the measured data were used for verification. The results show that the zone of influence of the tunnel crossing under the file foundation is reasonably divided, the design countermeasures can effectively control the impact of tunnel excavation on the viaduct, and meanwhile, the impact of pile foundation on the tunnel can be controlled.
KeywordsTunnel project,   Tunnel crossing under the pile foundation,   Surrounding rock stability,   Proximate zone of influence,   Settlement control standard     
Fund: 
Cite this article:   
YANG Xiong1 MENG Qinghui2 LI Pin1 XU Dengfei3 CAO Feng1 .Design and Analysis of the Tunnel Section at Railway Station Crossing Under the Pile Foundation[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 218-225
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I4/218
 
No references of article
[1] WANG Jianyu.A Critical Reflection on Innovation Themes of Conventional Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 1-9
[2] ZHANG Dewen SU Dingwu.Study on Grouting and Sealing for Tunnels in the Fault Fracture Zone Based on Ecological Protection[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 46-52
[3] WANG Zhilong1 WANG Weihao2 LIU Dagang1 YAN Zhiwei1 TIAN Hongtao1.Study on New Tunnel Support System Based on Norwegian Method Q System[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 31-39
[4] CUI Guangyao1 WEI Hanghang1 WANG Mingsheng2.A Field Test Study on the Large Deformation Control for Tunnels Built in Seriously-weathered Carbonaceous Slate Strata with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 183-189
[5] LI Wei1 LI Qing2 YANG Dan3.Study on Characteristics of Water Pressure on Tunnel Single-layer Lining Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 71-77
[6] ZHANG Fujun1 HU Jun2,3 DUAN Yu4 ZHU Caihui4.Optimization and Application of the Treatment Schemes for Water Inrush in a Water-rich Tunnel in Fault Zones[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 122-131
[7] WANG Huaizheng1 SONG Zhanping1,2 ZHANG Xuewen3 TIAN Xiaoxu1,2 PAN Hongwei4.Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 210-219
[8] CUI Guangyao1 JIANG Mengxin1 WANG Daoyuan2,3 WANG Xuelai1.Study of Thermal Insulation Effects of Off-wall Corrugated Steel Plate Liner Applied in Tunnels in the Seasonally Frozen Region[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 258-263
[9] JIANG Yajun1 HE Bin1 ZHAO Jumei1 LIU Jitai1 WANG Huqun2,3.Study on Mechanical Properties of Tunnel Lining Structure with Spray-applied Waterproofing Membrane[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 95-103
[10] YANG Juan1,2,3 YANG Qixin2,3 QIU Pinming2,3.Experimental Study on the Bonding Performances of Spray-applied Waterproofing Membrane in Tunnels with CSL Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 104-110
[11] WEI Gang1 HAO Wei2 WEI Xinjiang1 WANG Xiao2 ZHANG Shuyuan2.Numerical Simulation Study on Whole Construction Process of Vertical Pipe Jacking[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 59-67
[12] WANG Fei1 WANG Qing2 JIAO Weining2 Qin Wei3.Experimental Study on Dust Reduction Technology for D&B Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 196-203
[13] LI Pengfei1 HUANG Jingluo1,2 CHEN Keyi1 TONG Lei2.Statistical Analysis on Temporal and Spatial Characteristics of the Axial Force of Anchor Bolts in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 227-236
[14] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[15] YE Xinxin1 MIAO Miao2 ZHONG Yujian2 XU Shuoshuo2 DU Ke2.Analysis on Reinforcement Effect of Surface Grouting in Shallow-Buried Tunnels with Asymmetrical Loading and Abundant Underground Water[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 229-236
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY