Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :23-33    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research Progress of Subway Tunnel Passing Through Xi′an Ground Fracture and Application Prospect of "Shield Tunnelling before Expansion" Method
(1. School of Highway, Chang′an University, Xi′an 710064; 2. Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010;3. Xi′an Rail Transit Group Co., Ltd., Xi′an 710018)
Download: PDF (4625KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Xi′an ground fracture is a typical geological disaster in the loess area, which covers almost the whole ur? ban area. Its creep activity seriously endangers the safety of subway tunnels, which is a major technical problem in subway construction. Based on the ground fracture prevention and control experience of Xi′ an Metro for more than ten years, this paper systematically sorts out the distribution and activity characteristics of ground fractures, the hazards faced by the metro, the concept and measures of fortification, the fortification parameters, the operation of fortification structures, etc. It focuses on the analysis of the problems existing in the conventional construction method of "mined excavation + shield stepping", and puts forward a new construction technology of "shield tunnelling before expansion". The main conclusions are as follows: (1) The conventional construction method of metro passing through a ground fracture section involves a series of complex processes such as shaft and cross passage excavation, manual operation with CRD method, shield stepping, etc. The contradiction between the necessity of fortification and the complexity of existing construction technology seriously restricts the construction process of the Xi ′ an metro. (2) The construction process, problems to be solved and engineering application prospects of the new construction method of "shield tunnelling before expansion" are given. (3) The "shield tunnelling before expansion" method ensures the continuity of shield operation, avoids the launching and receiving in the shield tunnel, and then reduces the fortification section under the same fortification parameters through the optimization of structure and construction method,which is an important exploration and attempt to realize the convenient and low-cost ground fracture section of the subway tunnel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LAI Hongpeng1 YAO Yi1 GAO Qiang2 KANG Zuo3
KeywordsSubway tunnel   Xi&prime   an ground fracture   Engineering fortification   Construction technology   "Shield tun? nelling before expansion"   method     
Abstract: Xi′an ground fracture is a typical geological disaster in the loess area, which covers almost the whole ur? ban area. Its creep activity seriously endangers the safety of subway tunnels, which is a major technical problem in subway construction. Based on the ground fracture prevention and control experience of Xi′ an Metro for more than ten years, this paper systematically sorts out the distribution and activity characteristics of ground fractures, the hazards faced by the metro, the concept and measures of fortification, the fortification parameters, the operation of fortification structures, etc. It focuses on the analysis of the problems existing in the conventional construction method of "mined excavation + shield stepping", and puts forward a new construction technology of "shield tunnelling before expansion". The main conclusions are as follows: (1) The conventional construction method of metro passing through a ground fracture section involves a series of complex processes such as shaft and cross passage excavation, manual operation with CRD method, shield stepping, etc. The contradiction between the necessity of fortification and the complexity of existing construction technology seriously restricts the construction process of the Xi ′ an metro. (2) The construction process, problems to be solved and engineering application prospects of the new construction method of "shield tunnelling before expansion" are given. (3) The "shield tunnelling before expansion" method ensures the continuity of shield operation, avoids the launching and receiving in the shield tunnel, and then reduces the fortification section under the same fortification parameters through the optimization of structure and construction method,which is an important exploration and attempt to realize the convenient and low-cost ground fracture section of the subway tunnel.
KeywordsSubway tunnel,   Xi&prime,   an ground fracture,   Engineering fortification,   Construction technology,   "Shield tun? nelling before expansion",   method     
Cite this article:   
LAI Hongpeng1 YAO Yi1 GAO Qiang2 KANG Zuo3 .Research Progress of Subway Tunnel Passing Through Xi′an Ground Fracture and Application Prospect of "Shield Tunnelling before Expansion" Method[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 23-33
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/23
 
No references of article
[1] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[2] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[3] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[4] LUO Long1 ZHU Kaicheng2 HAN Yuxuan3 CAI Dong4 LIU Zheqi5 WANG Jun6.Research on Optimization of Construction Methods for Ultra-large Cross-section Tunnels: A Case Study of the Lihuashan Tunnel on the Tianfu New Area-Qionglai Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 273-282
[5] QIN Tiange 1, 2 WU Li CHEN Qian1 XIA Zhen1 LIU Shiya1, 2 CAI Xin1.Research Status and Development Trends of Intelligent Construction System for Drill and Blast Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 1-10
[6] LI Pengfei ZHANG Jialong ZHANG Mingju CUI Xiaopu HUANG Zhengdong MA Rui.Experimental Study on the Mechanical Performance of Steel Corrugated Plate-fabricform Concrete Support Joints in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 170-181
[7] TANG Xie LIN Guojin1, 2 ZHANG Hang2.Adaptive Strategies for Mechanized Drill-and-Blast Construction in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 217-228
[8] WANG Zhilong1,2,3,4 WANG Mingnian2,3,4 ZHANG Xiao2,3,4 TONG Jianjun2,3,4 LIU Dagang2,3,4.Study on Mechanical Behaviors and Spatiotemporal Effects in Mechanized Large-section Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 229-239
[9] SONG Zhanping1,2,3 LI Xueli1 ZHANG Yuwei1,2,3 ZHONG Shiming1 SHI Wei4.Review and Prospect of the Mining Construction Methods for Subway Stations in China[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 1-15
[10] ZHANG Guang1 GONG Qiuming1 XIE Xingfei1 PEI Chengyuan2 SHANG Ceng2.Interval Prediction of TBM Parameters in Stable Excavation Sections Based on Bootstrap-COA-BiGRU Model[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 121-131
[11] ZENG Shiqi1,2 CHEN Xiangsheng1,2,3,4 TAN Yijun1,2 LIU Pingwei2 SU Dong1,2,3,4.Research on the Inversion Model of the Ground Load on Ultra-large Diameter Shield Tunnels Based on TL-GA-BP Algorithm[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 110-120
[12] ZHANG Xinyang1,2 SHEN Yusheng1,2 CHANG Mingyu1,2 LIU Tong1,2 SUN Tianshe3, 4 HU Shuai3, 4.Study on the Control Law of Surface Deformation in Shield Tunnels in Mudstone Strata with the Clay Shock Construction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 283-290
[13] YANG Cunbin1,2 REN Yang,1,2 WU Yuehua1,2 HE Wanchao1,2 LI Tianbin1,2.Dynamic Intelligent Prediction of Tunnel Surrounding Rock Geological Information Based on M-LSTM Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 74-82
[14] HE Boning.Review of Guidance and Positioning Technologies for Full-face Tunnel Boring Machines[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 1-9
[15] LIU Xiang1 LI Kuichen1 ZHANG Rui1 HUANG Jun2 ZHAO Guang2 FANG Qian3 JIANG Annan1.Study on Steel Plate Cutting Deformation and Support Force for Excavation with Large Pipe Spacing in Pipe Curtain-Structure Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 28-37
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY