Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :23-33    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research Progress of Subway Tunnel Passing Through Xi′an Ground Fracture and Application Prospect of "Shield Tunnelling before Expansion" Method
(1. School of Highway, Chang′an University, Xi′an 710064; 2. Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010;3. Xi′an Rail Transit Group Co., Ltd., Xi′an 710018)
Download: PDF (4625KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Xi′an ground fracture is a typical geological disaster in the loess area, which covers almost the whole ur? ban area. Its creep activity seriously endangers the safety of subway tunnels, which is a major technical problem in subway construction. Based on the ground fracture prevention and control experience of Xi′ an Metro for more than ten years, this paper systematically sorts out the distribution and activity characteristics of ground fractures, the hazards faced by the metro, the concept and measures of fortification, the fortification parameters, the operation of fortification structures, etc. It focuses on the analysis of the problems existing in the conventional construction method of "mined excavation + shield stepping", and puts forward a new construction technology of "shield tunnelling before expansion". The main conclusions are as follows: (1) The conventional construction method of metro passing through a ground fracture section involves a series of complex processes such as shaft and cross passage excavation, manual operation with CRD method, shield stepping, etc. The contradiction between the necessity of fortification and the complexity of existing construction technology seriously restricts the construction process of the Xi ′ an metro. (2) The construction process, problems to be solved and engineering application prospects of the new construction method of "shield tunnelling before expansion" are given. (3) The "shield tunnelling before expansion" method ensures the continuity of shield operation, avoids the launching and receiving in the shield tunnel, and then reduces the fortification section under the same fortification parameters through the optimization of structure and construction method,which is an important exploration and attempt to realize the convenient and low-cost ground fracture section of the subway tunnel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LAI Hongpeng1 YAO Yi1 GAO Qiang2 KANG Zuo3
KeywordsSubway tunnel   Xi&prime   an ground fracture   Engineering fortification   Construction technology   "Shield tun? nelling before expansion"   method     
Abstract: Xi′an ground fracture is a typical geological disaster in the loess area, which covers almost the whole ur? ban area. Its creep activity seriously endangers the safety of subway tunnels, which is a major technical problem in subway construction. Based on the ground fracture prevention and control experience of Xi′ an Metro for more than ten years, this paper systematically sorts out the distribution and activity characteristics of ground fractures, the hazards faced by the metro, the concept and measures of fortification, the fortification parameters, the operation of fortification structures, etc. It focuses on the analysis of the problems existing in the conventional construction method of "mined excavation + shield stepping", and puts forward a new construction technology of "shield tunnelling before expansion". The main conclusions are as follows: (1) The conventional construction method of metro passing through a ground fracture section involves a series of complex processes such as shaft and cross passage excavation, manual operation with CRD method, shield stepping, etc. The contradiction between the necessity of fortification and the complexity of existing construction technology seriously restricts the construction process of the Xi ′ an metro. (2) The construction process, problems to be solved and engineering application prospects of the new construction method of "shield tunnelling before expansion" are given. (3) The "shield tunnelling before expansion" method ensures the continuity of shield operation, avoids the launching and receiving in the shield tunnel, and then reduces the fortification section under the same fortification parameters through the optimization of structure and construction method,which is an important exploration and attempt to realize the convenient and low-cost ground fracture section of the subway tunnel.
KeywordsSubway tunnel,   Xi&prime,   an ground fracture,   Engineering fortification,   Construction technology,   "Shield tun? nelling before expansion",   method     
Cite this article:   
LAI Hongpeng1 YAO Yi1 GAO Qiang2 KANG Zuo3 .Research Progress of Subway Tunnel Passing Through Xi′an Ground Fracture and Application Prospect of "Shield Tunnelling before Expansion" Method[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 23-33
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/23
 
No references of article
[1] LI Yao1 DONG Xing1 CAO Xiaoyong2 XU Ping2.A Study on Control Size of Blast Muck for Vertical Shaft Construction Using the Raise-boring Method[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 194-202
[2] YUAN Jie1 QI Jiarui2 XIAO Xiang1 LI Zanxin1 YU Lixin1 PAN Yiheng2.An Experimental Study on the Active Regulation of Filling Pressure in Shield Receiving Steel Sleeve[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 230-237
[3] DU Yongxiao1,2,3 SUN Xiaoli1,2,4 YANG Jun1,2,4 ZHANG Yansen1,2.A Study on the Detection and Evaluation of the Technical Condition of Fire Damage in Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 260-270
[4] ZHANG Kexue1,2,3,4,5,6 WU Yongwei1,3,6 HE Manchao2 CHEN Xuexi1,3,6 JIANG Yaodong4 LI Dong1,3,6.Research on the Intelligent Comprehensive Evaluation of Coal Seam Impact Risk Based on the BP Neural Network Optimized by the Bat Algorithm[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 38-46
[5] ZHANG Jianyong1 LI Mingyu2,3 CHEN Jian3,4 YU Liucheng2 LI Yixiang1 YANG Gongbiao3,4 WANG Yue2,3.Prediction Methods for Segment Uplift in Large-diameter Shield Tunnels Based on Double Elastic Foundation Beams[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 159-167
[6] WU Ze1 GU Fulin2 FU Yanbin3.Quantitative Deviation Correction Technologies for Subway Shield Tunnels in Operation through Compaction Grouting[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 185-193
[7] GUO Chun1,2 GUO Yalin1,2 CHEN Zheng1,2.Carbon Emission Accounting and Research Progress Analysis of Traffic Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 1-10
[8] PU Song1 XIANG Long2 LIAO Hang1 YU Tao1 YAO Zhigang1 FANG Yong1 ZHU Muyuan1.Unsymmetrical Loading Evolution Law and Surrounding Rock Control for tunnels with Extremely High Geostress and Layered Surrounding Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 90-99
[9] CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi.Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 233-240
[10] YANG Yanchun.Research on the Initial In-situ Stress Inversion Method Based on Disturbance Correction of Tunnel Excavation and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 100-106
[11] MA Huabing1 SHAN Hongwei1 GUO Yawei2 FU Baiyong2 SHANGGUAN Shiqing3.Study on Full-scale Test for Bottom Contact Status of Prefabricated Utility Tunnel Based on Impact Imaging Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 162-169
[12] CHEN Yingying1,2 LIU Xingen1,2 HUANG Yongliang3,4 LI Mingdong1.Crack Identification of Tunnel Lining Based on Neural Network and Edge Correction[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 24-34
[13] WANG Zijian1 LIU Teng2 JI Xiaodong1 LIU Xueyan1.Study on the Upper Limit of Stability of the Slope Excavation Face of a Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 42-50
[14] ZHAO Aijun1 WEI Yanqing2 HUANG Taiping1.Study on the Decision-making System for the Selection of Highway Tunnel Face Layout Type Based on the Fuzzy Comprehensive Evaluation Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 61-69
[15] XU Yonghao.Study on Seismic Resistance of Column-free Atrium Style Subway Station Based on the Integral Response Displacement Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 77-85
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY