Study on Two-bench Construction Method with Rapid Ring Closure under the Condition of Large Soft Rock Deformation in Yuelongmen Tunnel
(China Railway 19th Bureau Group Sixth Engineering Co., Ltd., Wuxi 214028)
Download: PDF (4899KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Given the large deformation of soft rock with high ground stress in the Yuelongmen Tunnel on the newly built Chengdu-Lanzhou Railway, the concept of "active control" has been proposed. In addition to the advantage of rapid mechanized construction, the control measures including "optimized contour, two-layer support, step-by-step reservation, anchor-support combination, surrounding rock consolidation and rapid closure" are employed, where emphasis is put on the process control of deformation development. The key technology of "two-bench (inclusive of tunnel bottom) construction with short bench rapid ring closure" has been developed, to eventually achieve effective control of large deformation in soft rock.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Guoqiang
KeywordsHigh ground stress   Weak surrounding rock   Tunnel with large deformation   Rapid ring closure   Con? struction technology     
Abstract: Given the large deformation of soft rock with high ground stress in the Yuelongmen Tunnel on the newly built Chengdu-Lanzhou Railway, the concept of "active control" has been proposed. In addition to the advantage of rapid mechanized construction, the control measures including "optimized contour, two-layer support, step-by-step reservation, anchor-support combination, surrounding rock consolidation and rapid closure" are employed, where emphasis is put on the process control of deformation development. The key technology of "two-bench (inclusive of tunnel bottom) construction with short bench rapid ring closure" has been developed, to eventually achieve effective control of large deformation in soft rock.
KeywordsHigh ground stress,   Weak surrounding rock,   Tunnel with large deformation,   Rapid ring closure,   Con? struction technology     
Cite this article:   
LIU Guoqiang .Study on Two-bench Construction Method with Rapid Ring Closure under the Condition of Large Soft Rock Deformation in Yuelongmen Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 252-258
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/252
 
No references of article
[1] WANG Xiuling1,2.Model Experimental Study on Interaction Characteristics of Rock and Structure in Weak Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 164-174
[2] PU Song1 XIANG Long2 LIAO Hang1 YU Tao1 YAO Zhigang1 FANG Yong1 ZHU Muyuan1.Unsymmetrical Loading Evolution Law and Surrounding Rock Control for tunnels with Extremely High Geostress and Layered Surrounding Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 90-99
[3] LIU Zhi1 ZHONG Changping2.Research on Key Technologies for Tunnelling in Faulted Fracture Zones by Slurry Balance Shields with Super Larg[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 225-232
[4] WANG Mingjiang1 CI Xinhang2 CHEN Junwu3 ZHU Changjiang1 YANG Feng2.Construction Technology for the Shallow Twin-tube Six-lane Multi-arch Tunnel without Middle Drift under Large Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 241-248
[5] WANG Yaqiong1,2 YANG Qiang1,2 PAN Hongwei3 GAO Qidong1,2 ZHANG Shichao1,2 WANG Zhifeng1,2.Analysis on Deformation and Failure Characteristics of Surrounding Rock in Horizontal Layered Tunnels under High Crustal Stress Based on 3DEC Simulation[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 127-136
[6] MA Dong JIN Liujie WANG Wuxian HUANG Lixin.Discussion on the Timing for the Secondary Lining Construction in Soft Ground Tunnels with High Geostress Based on Numerical Simulation and Measured Data Fitting[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 137-146
[7] CUI Guangyao1 WEI Hanghang1 WANG Mingsheng2.A Field Test Study on the Large Deformation Control for Tunnels Built in Seriously-weathered Carbonaceous Slate Strata with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 183-189
[8] LUO Chun1 ZHANG Zhiqiang1 LIN Dirui1 TANG Zelin2.Study of the Impact of Single-and Double-tube Tunnel Systems on Rockburst in Deep-buried Extra-long Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 28-37
[9] YUAN Wei1 LU Junfu2 LIU Jinsong1 WU Junmeng1.Cause Analysis of Persistent Heaving of Tunnel Floors in Red-bed Mudstone with Complex Geo-stress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 242-250
[10] CHEN Zhimin1,2 LI Jiangpeng1 XUE Zhiwen3.Model Test Study on‘Lost’Deformation and Corresponding Control Measures in Soft Rock Tunnels with Extremely High Ground Stress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 164-175
[11] DONG Jiansong.Construction Technology of Xiamen Haicang Subsea Tunnel Crossing Weathered Trough[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 197-203
[12] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[13] ZHU Weibin1,2 ZHONG Changping3 MI Jinsheng1 HUANG Weiran4.Challenges and Prospects of Construction Technology for Extra-large Diameter Composite Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 6-16
[14] CHENG Gang1 WANG Jun2.Study on Damage Behaviors of Tunnel Secondary Lining under Rheological Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 123-129
[15] WEI Yinghua LIU Fei.Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 46-54
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY