|
2023, Vol. 60(3): 252-258 DOI: | ||
Study on Two-bench Construction Method with Rapid Ring Closure under the Condition of Large Soft Rock Deformation in Yuelongmen Tunnel | ||
(China Railway 19th Bureau Group Sixth Engineering Co., Ltd., Wuxi 214028) | ||
Received null Revised null | ||
Supporting info | ||
|