| [1] |
ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204 |
| [2] |
WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10 |
| [3] |
.Construction Technology for the Dazhushan Tunnel in a High-Pressure Fault with Abundant Water[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 160-166 |
| [4] |
WANG Ke- 1 Lai-Jin-Xing- 2 Qiu-Jun-Ling- 2, 4 Huang- Hao- 3 Li-Xiao-Hong- 4.On the Effects of Horizontal Jet Grouting Pile Pre-Reinforcement of Tunnels in a Strong Weathered Granite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 168-175 |
| [5] |
Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40 |
| [6] |
Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6 |
| [7] |
Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14 |
| [8] |
Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23 |
| [9] |
Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48 |
| [10] |
Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54 |
| [11] |
Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61 |
| [12] |
Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31 |
| [13] |
Zhang Han1,2, Li Yingming1,3, Ren Fangtao2, Yang Mingdong3.Elasto-Plastic Analysis of the Surrounding Rock of a Tunnel/Roadway Based on the Zienkiewicz-Pande Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 30-35 |
| [14] |
Zhou Zelin, Chen Shougen, Li Yansong.Study of the Mechanical Characteristics of the Support Structure of a Deeply Buried Diversion Tunnel in Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 36-43 |
| [15] |
Liu Qiang1, Tan Zhongsheng1, Chen Libao2, Zou Xiaoxin1.Field Tests Regaring the Uncertainty of the Calculation Model for Soil Filling Pressure on Open-Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 128-134 |
|
|
|