Technique Problems Need to be Solved Urgently in Current Railway Tunnel Construction
(1 Southwest Jiaotong University, Chengdu  610031; 2 China Railway No.2 Engineering Group Co. Ltd, Chengdu  610032;
3 College of Water Resource and Hydropower, Sichuan University, Chengdu  610065)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Tunneling in high-speed railways is characterized by high construction standards, great construction difficulties, high safety risks and strict construction management requirements. Taking the Guiguang high-speed railway as an example, this paper analyzes several key problems that restrict construction efficiency and safety. Based on the current technical status of domestic railway tunnel construction, some conclusions were drawn: 1) Excavation with the micro bench method utilizing precise blasting technology can solve the contradiction between excavation advancement and keeping a safe distance between different processes for rocks class IV and V; 2) Trackless transportation, which benefits from the progress of ventilation technology and air purification technology, is applicable to the construction of long tunnels with large sections; 3) Developing and applying fast construction equipment for tunnel invert construction and movable formworks for the construction of water ditches and cable grooves filled a gap in this field; and 4) Information-oriented construction is the trend of tunnel construction technology development in the future.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
MA Hui-12
Liu-Ren-Zhi-2
Chen-Shou-Gen-1
Gao-Ming-Zhong-3
KeywordsHigh-speed railway   Tunnel construction   Technical innovation   Micro-bench method   Invert rapid construction     
Abstract: Tunneling in high-speed railways is characterized by high construction standards, great construction difficulties, high safety risks and strict construction management requirements. Taking the Guiguang high-speed railway as an example, this paper analyzes several key problems that restrict construction efficiency and safety. Based on the current technical status of domestic railway tunnel construction, some conclusions were drawn: 1) Excavation with the micro bench method utilizing precise blasting technology can solve the contradiction between excavation advancement and keeping a safe distance between different processes for rocks class IV and V; 2) Trackless transportation, which benefits from the progress of ventilation technology and air purification technology, is applicable to the construction of long tunnels with large sections; 3) Developing and applying fast construction equipment for tunnel invert construction and movable formworks for the construction of water ditches and cable grooves filled a gap in this field; and 4) Information-oriented construction is the trend of tunnel construction technology development in the future.
KeywordsHigh-speed railway,   Tunnel construction,   Technical innovation,   Micro-bench method,   Invert rapid construction     
published: 2011-08-11
Cite this article:   
MA Hui-12, , Liu-Ren-Zhi-2 etc .Technique Problems Need to be Solved Urgently in Current Railway Tunnel Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(5): 1-6
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I5/1
 
No references of article
[1] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[2] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[3] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[4] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[5] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[6] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[7] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[8] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[9] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
[10] Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[11] Zhang Han1,2, Li Yingming1,3, Ren Fangtao2, Yang Mingdong3.Elasto-Plastic Analysis of the Surrounding Rock of a Tunnel/Roadway Based on the Zienkiewicz-Pande Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 30-35
[12] Zhou Zelin, Chen Shougen, Li Yansong.Study of the Mechanical Characteristics of the Support Structure of a Deeply Buried Diversion Tunnel in Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 36-43
[13] Liu Qiang1, Tan Zhongsheng1, Chen Libao2, Zou Xiaoxin1.Field Tests Regaring the Uncertainty of the Calculation Model for Soil Filling Pressure on Open-Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 128-134
[14] Li Yufeng1,2, Peng Limin1, Lei Mingfeng1,2.Dynamics Issues Regarding High-Speed Railway Crossing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 8-15
[15] Jin Dalong, Li Xinggao.Model Test of the Relationship between the Face Support Pressure and Ground Surface Deformation of a Shield-Driven Tunnel in Sand Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 44-51
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY