现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2011, Vol. 48(5): 1-6    DOI:
Technique Problems Need to be Solved Urgently in Current Railway Tunnel Construction
(1 Southwest Jiaotong University, Chengdu  610031; 2 China Railway No.2 Engineering Group Co. Ltd, Chengdu  610032;
3 College of Water Resource and Hydropower, Sichuan University, Chengdu  610065)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn