|
2011, Vol. 48(5): 1-6 DOI: | ||
Technique Problems Need to be Solved Urgently in Current Railway Tunnel Construction | ||
(1 Southwest Jiaotong University, Chengdu 610031; 2 China Railway No.2 Engineering Group Co. Ltd, Chengdu 610032; 3 College of Water Resource and Hydropower, Sichuan University, Chengdu 610065) |
||
Received null Revised null | ||
Supporting info | ||
|