Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (3) :119-124    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Design of a Metro Underpass with a Pipe-Jacking System Featuring Large Rectangular Sections
China Railway Tunnel Survey & Design Institute Co., Ltd
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Pipe-jacking is a trenchless technology used to build tunnels that utilizes a hydraulic jack to place prefabricated segment linings according to design schemes. This method can significantly reduce the effects of construction on road traffic and reduce the need to relocate pipelines by using large rectangular sections in a metro underpass. Based on the analysis of one metro underpass, this paper verifies that utilizing large rectangular sections in pipe-jacking is an advanced method and encourages rapid and safe construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: Pipe-jacking is a trenchless technology used to build tunnels that utilizes a hydraulic jack to place prefabricated segment linings according to design schemes. This method can significantly reduce the effects of construction on road traffic and reduce the need to relocate pipelines by using large rectangular sections in a metro underpass. Based on the analysis of one metro underpass, this paper verifies that utilizing large rectangular sections in pipe-jacking is an advanced method and encourages rapid and safe construction.
Keywords:   
Cite this article:   
.Design of a Metro Underpass with a Pipe-Jacking System Featuring Large Rectangular Sections[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(3): 119-124
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I3/119
 
No references of article
[1] LIU Cheng GUAN Huisheng XIE Youhui SONG Yingpeng.Study on Driving Posture and Deviation Correction Curve of the Shield Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 105-112
[2] ZHUO Bin1 LI Sheng1 HE Chuan2 WANG Huan3 WANG Qicai1 MA Li4.Study on Mechanical Characteristics and Section Design of Trench Type Opencut Tunnel Lining Structure with Deep Covering Soil under Load Reduction[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 79-87
[3] HUANG Qiangbing1,2 GUO Rui3 ZHANG Ning1 MENG Zhengjiang1,2.Anti-cracking Design for a Tunnel on the Lintong Line of Xi′an Metro Crossing Ground Fissures and Fault Zones[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 144-151
[4] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[5] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 72-78
[6] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 201-209
[7] LI Chunhui LI Hongzhou WU Yong LI Ronghua.Design and Development of a GIS-Based Management System for Tunnel Collapse Rescue[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 59-63
[8] KUANG Liang1,2.Limit State Design for a Tunnel Portal in an Earthquake Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 64-68
[9] ZHU Yaohong1 XIAYANG Yuyu2 DONG Zibo1 LIU Xian2.Calculation Parameters of a Shield Tunnel Structure with a Staggered Segmental Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 114-121
[10] WEI Gang1 XING Jianjian2 SU Qinwei3 LU Shijie2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 139-145
[11] ZHANG Minqing1 LV Gang2 LIU Jianyou2 JIAO Yunzhou1 LUO Duhao3.Application of Chinese Characters in the Design and Construction of the Badaling Great Wall Station of the Beijing-Zhangjiakou High-Speed Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 6-9
[12] WU Jingang.WU JingangFeasibility Study of Immersed Tube Technology for the Qianhaiwan Subsea Tunnel in the Mawan Channel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 28-36
[13] TIAN Zhi-Yu, Yang- Feng, Zhang-Zhao-Jie, WANG Bo, Wang-Wei-Jia.Opinions on Amendments to Partial Provisions for Tunnel Structure Calculation in“JTG D70-2010 Guidelines for Design of Road Tunnel”[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 1-7
[14] WANG Zhufeng1,2 FENG Huanhuan1,2.Clay Cake Prevention for a Slurry Shield Cutterhead in Argillaceous Siltstone Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 217-222
[15] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY