Technical Measures for Blasting Vibration Control in Urban Underground Works
(Huaibei Blasting Research Institute, CCTEG, Huaibei, 235000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  This paper presents the generating mechanism of blasting vibration and analyzes the hazards induced by the blasting vibration of urban underground works. It concludes eight kinds of technical measures for blasting vibration control, such as controlling the initialing charge per delay interval, a reasonable interval time of initiation, proper cut type, and non-explosive blasting based on the engineering practice. Ultimately, it points out that the selection of appropriate vibration control measures should be based on the specific conditions during blasting of urban underground works.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XUE Xian-Bin
Zhang-Ji-Can
Sun-Xue-Qin
Keywords Underground works   Blasting vibration   Control measures     
Abstract: This paper presents the generating mechanism of blasting vibration and analyzes the hazards induced by the blasting vibration of urban underground works. It concludes eight kinds of technical measures for blasting vibration control, such as controlling the initialing charge per delay interval, a reasonable interval time of initiation, proper cut type, and non-explosive blasting based on the engineering practice. Ultimately, it points out that the selection of appropriate vibration control measures should be based on the specific conditions during blasting of urban underground works.
Keywords Underground works,   Blasting vibration,   Control measures     
published: 2013-09-01
Cite this article:   
XUE Xian-Bin, Zhang-Ji-Can, Sun-Xue-Qin .Technical Measures for Blasting Vibration Control in Urban Underground Works [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(4): 191-194
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I4/191
 
No references of article
[1] LI Junjie.Influence on Deformation and Control Measures: A Case Study of Bored Running Tunnel Construction Adjacent to Existing Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 168-174
[2] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 79-87
[3] ZHANG Jun1 ZHOU Libo2 GAO Peiwei3 XU Shaoyun3 ZHANG Lifang3 LU Xiaolin3.Interfacial Bonding Properties of Polymer-Modified Repair Material in Humid
Underground Circumstances
[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 210-215
[4] QI Xiaohan1 ZHANG Dongming2.Contrast and Application of the Hollow Inclusion Stress Relief Method and Acoustic Emission Method to the In-Situ Stress Measurement in Tunnels with Rockburst Hazards[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 216-223
[5] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[6] PEI Qitao1 DING Xiuli1 HUANG Shuling1 ZHANG Yuting1 LUO Chaowen2.Estimation Method for Geostress Based on a Modified Shoerey Model[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 36-43
[7] .Discussion of Construction Techniques for the Slurry Shield-Driven River Crossing Tunnel with Large-Section[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 169-173
[8] LI Yuan-Hai- 1, 2 Yang- Fan- 1, 2 Liu-Ji-Qiang- 3 Peng- Hui- 4 Li-Jian-Hua- 5.Development and Application of an Information Management System for Monitoring Subway Construction Safety Based on SuperMap Objects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 153-159
[9] 吕Xian-Fu- 1 Zhao-Zhan-Qun- 2 Wei-Xing-Xing- 2.Discussion of the Large Deformation Mechanism and Control Measures for a Soft Rock Tunnel under High Ground Stress: A Case Study of the Muzhailing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 227-231
[10] GAO Bingli REN Jianxi.Safety Risk Assessment for Adjacent Underground Pipelines in Metro Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 118-123
[11] ZHANG Yuting1 DING Xiuli1 ZHOU Shuda2.Seismic Response Analysis of Surrounding Rocks Around Underground Works Adjacent to Bank Slopes[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 40-47
[12] Ning Maoquan.Research on and Control Measures for Base Elevation Variations of Open-Cut Tunnels in Deep Soft Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 31-38
[13] Huang Xiongjun.Failure Mechanism and Control Measures for Gas Bursts in Gas Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 205-210
[14] Xie Taofeng1,2, Xie Wenbing2, Jing Shengguo1,2, Zhou Xiaoting3.A Mathematical Model for Fracture Grouting in Underground Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 105-109
[15] WAN Liang-Yong-1, SONG Zhan-Ping-2, 3 , QU Jian-Sheng-2, 3 , SONG Yun-Cai-3.Anaysis of Construction Techniques for a Metro Tunnel Approaching an Existing Station[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(1): 168-176
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY