MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (5) :66-70    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study of the Mechanical Properties of Bench Length Based on the Hoek-Brown Criterion
(China Railway 18th Bureau Group Co. Ltd., Tianjin 300222)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  Based on the Hoek-Brown criterion, the tunnel construction process under different bench lengths was simulated with finite-element simulation, and the displacement response laws of the tunnel section and ground surface were analyzed. The results show that: the horizontal convergence and vault settlement increase with an increase of the bench length; compared with a bench length of 2m, the vault settlements increase by 9%, 25%, 29%, and 36%, and the horizontal convergences increase by 9%, 12.5%, 15.6%, and 25% with the bench lengths of 4m, 6m, 8m and 10m; and bench length has little effect on the principal stress and plastic zone after excavation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHAO Jing-Bo
KeywordsBench length   Hoek-brown criterion   3D numerical simulation     
Abstract: Based on the Hoek-Brown criterion, the tunnel construction process under different bench lengths was simulated with finite-element simulation, and the displacement response laws of the tunnel section and ground surface were analyzed. The results show that: the horizontal convergence and vault settlement increase with an increase of the bench length; compared with a bench length of 2m, the vault settlements increase by 9%, 25%, 29%, and 36%, and the horizontal convergences increase by 9%, 12.5%, 15.6%, and 25% with the bench lengths of 4m, 6m, 8m and 10m; and bench length has little effect on the principal stress and plastic zone after excavation.
KeywordsBench length,   Hoek-brown criterion,   3D numerical simulation     
published: 2014-08-25
Cite this article:   
ZHAO Jing-Bo .Study of the Mechanical Properties of Bench Length Based on the Hoek-Brown Criterion [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(5): 66-70
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I5/66
 
No references of article
[1] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[2] WANG Liuxun.Study on the Construction Equipment Configuration Scheme for Tunnelling under High Altitude, Low Oxygen Content and Low Atmospheric Pressure Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 259-265
[3] SANG Conghui1,2 QIAO Liwei1,2 WANG Lieni3 YUAN Wenchao4 ZHAO Yanfa5.High-precision Discrete Simulation Method of Floating Dusts Based on Two-stage Solution and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 203-211
[4] WANG Wei1,2 LI Xianmin1 SUN Xinhai1,2.Numerical Simulation Study on the Supporting Effect of Bolts in Interbedded Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 99-107
[5] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[6] HE Faliang.On the Problem of“Geologic Uncertainty”in Tunnelling and Its Solutions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 8-13
[7] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[8] SONG Junxiu1 WAN Xiaolin2 GUO Chun1.Study on Construction Ventilation Scheme of Air Cabin for An′ding Tunnel on Yumo Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 232-238
[9] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[10] YU Jianxin1 LIU Huanchun2 WEI Haixia1 CHEN Chen2.On Mutual Dynamic Effect of Tunnel Blasting Construction Adjacent to Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 85-92
[11] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[12] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 106-114
[13] QU Haobo1,2 LI Lin2.Preliminary Analysis of Causes of Closing Type Blockage Disasters during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 51-55
[14] ZHANG Tao.Rapid Construction Technique for a Large Upper-Section of the Tianping Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 203-209
[15] .Analysis of the Reliability of Advanced Geological Prediction during TunnelConstruction Based on the Attribute Recognition Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 48-55
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY