Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (5) :66-70    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study of the Mechanical Properties of Bench Length Based on the Hoek-Brown Criterion
(China Railway 18th Bureau Group Co. Ltd., Tianjin 300222)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  Based on the Hoek-Brown criterion, the tunnel construction process under different bench lengths was simulated with finite-element simulation, and the displacement response laws of the tunnel section and ground surface were analyzed. The results show that: the horizontal convergence and vault settlement increase with an increase of the bench length; compared with a bench length of 2m, the vault settlements increase by 9%, 25%, 29%, and 36%, and the horizontal convergences increase by 9%, 12.5%, 15.6%, and 25% with the bench lengths of 4m, 6m, 8m and 10m; and bench length has little effect on the principal stress and plastic zone after excavation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHAO Jing-Bo
KeywordsBench length   Hoek-brown criterion   3D numerical simulation     
Abstract: Based on the Hoek-Brown criterion, the tunnel construction process under different bench lengths was simulated with finite-element simulation, and the displacement response laws of the tunnel section and ground surface were analyzed. The results show that: the horizontal convergence and vault settlement increase with an increase of the bench length; compared with a bench length of 2m, the vault settlements increase by 9%, 25%, 29%, and 36%, and the horizontal convergences increase by 9%, 12.5%, 15.6%, and 25% with the bench lengths of 4m, 6m, 8m and 10m; and bench length has little effect on the principal stress and plastic zone after excavation.
KeywordsBench length,   Hoek-brown criterion,   3D numerical simulation     
published: 2014-08-25
Cite this article:   
ZHAO Jing-Bo .Study of the Mechanical Properties of Bench Length Based on the Hoek-Brown Criterion [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(5): 66-70
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I5/66
 
No references of article
[1] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[2] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 106-114
[3] QU Haobo1,2 LI Lin2.Preliminary Analysis of Causes of Closing Type Blockage Disasters during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 51-55
[4] ZHANG Tao.Rapid Construction Technique for a Large Upper-Section of the Tianping Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 203-209
[5] .Analysis of the Reliability of Advanced Geological Prediction during TunnelConstruction Based on the Attribute Recognition Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 48-55
[6] .Strata Disturbance Influenced by Soil Mechanical Parameters Varying with Dynamic Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 131-136
[7] GUO Ru-Jun- 1, 2 He-Fa-Liang- 2.Geological Structures Inclined to Hazards due to Water Burst in Tunnel construction and Their Classifications[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 55-60
[8] ZHANG Zhi-Guo- 1, 2 , 3 , 4 Lu-Ming-Hao- 2 Xu- Chen- 2 Gong-Jian-Fei- 3 Zhao-Qi-Hua- 4.Simplified Solution for Tunnelling-Induced Pile Foundation Deformation Based on the Kerr Foundation Model[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 55-66
[9] SONG Li.Key Techniques for Construction of the Taiyue Mountain Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 194-199
[10] .Monitoring Data Processing, Feedback Analysis and Stability Prediction during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 121-127
[11] YU Gang1,2, HU Min1,2, GAO Xinwen2,3, CHEN Lisheng4, ZHAO Guoqiang4.BIM Based 3D Visual Construction Management System for Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(1): 1-5
[12] Xie Dawen.Experimental Study of Tunnelling Technology Combining a Boom-Type Roadheader with Smooth Blasting[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 216-220
[13] DENG Hong-Liang-1, FU Si-Yuan-1, GAO Wen-Xue-1, ZHOU Shi-Sheng-2, DENG Qi-Hua-3.3D Point Cloud Monitoring Technology and its Application in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(5): 199-204
[14] ZHANG Cheng-Ping, ZHANG Ding-Li, HAN Kai-Hang, WANG Jian-Chen.Study of Engineering Properties and Subsidence Characteristics after Driving of the Shenzhen Metro Tunnel in Water-Rich Soft Ground [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(4): 113-120
[15] LIU Cheng-Yu-1, Liu-Zhao-Wei-2.Analysis of Karst Development Zones Based on Surface Settlement[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(3): 67-72
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY