Calculation Method for the Passive Limit Support Pressure of an Extra-Large Diameter Slurry Balance Pipe-Jacking Machine in Clay
(1 Key Laboratory for Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092; 2 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 3 Shanghai Urban Construction Municipal Engineering Group Co. Ltd., Shanghai 200065)
Download: PDF (1417KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Considering that the support pressure of a pipe-jacking machine must be lower than the passive limit support pressure to ensure stability of the working face, this paper proposes a calculation method for the passive limit support pressure of an extra-large diameter slurry balance pipe-jacking machine in clay based on the ultimate equilibrium of the working face. First, the jacking pipe's passive failure model was studied using anumerical simulation, then a relevant calculation concept was established based on the results and finally the method's rationality was preliminarily verified by the numerical simulation of a practical case. Compared with other methods and based on the analysis of its influence factors, it is indicated that:1) the horizontal cylinder failure mode, which is a passive failure mode and independent of buried depth, is appropriate for the slurry jacking pipe; 2) the proposed method is applicable to the practice for its rationality and simple calculations, of which the application condition for the layered and homogeneous clay simply requires that the working face being kept in a single stratum; 3) the method is more conservative than others, with reasonable lower values; and 4) the obtained passive support pressure increases with an increase of the depth-diameter ratio, internal friction angle and cohesion.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHOU Shu-Wei-1
2
XIA Cai-Chu-1
2
GE Jin-Ke-3
WANG
SHUANG 1
2
ZHANG Ping-Yang-1
2
KeywordsSlurry balance   Jacking pipe with extra-large diameter   Passive limit support pressure   Failure mode   Ultimate equilibrium     
Abstract: Considering that the support pressure of a pipe-jacking machine must be lower than the passive limit support pressure to ensure stability of the working face, this paper proposes a calculation method for the passive limit support pressure of an extra-large diameter slurry balance pipe-jacking machine in clay based on the ultimate equilibrium of the working face. First, the jacking pipe's passive failure model was studied using anumerical simulation, then a relevant calculation concept was established based on the results and finally the method's rationality was preliminarily verified by the numerical simulation of a practical case. Compared with other methods and based on the analysis of its influence factors, it is indicated that:1) the horizontal cylinder failure mode, which is a passive failure mode and independent of buried depth, is appropriate for the slurry jacking pipe; 2) the proposed method is applicable to the practice for its rationality and simple calculations, of which the application condition for the layered and homogeneous clay simply requires that the working face being kept in a single stratum; 3) the method is more conservative than others, with reasonable lower values; and 4) the obtained passive support pressure increases with an increase of the depth-diameter ratio, internal friction angle and cohesion.
KeywordsSlurry balance,   Jacking pipe with extra-large diameter,   Passive limit support pressure,   Failure mode,   Ultimate equilibrium     
published: 2015-01-12
Cite this article:   
ZHOU Shu-Wei-1, 2 , XIA Cai-Chu-1 etc .Calculation Method for the Passive Limit Support Pressure of an Extra-Large Diameter Slurry Balance Pipe-Jacking Machine in Clay[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(3): 127-136
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2015/V52/I3/127
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY