|
2015, Vol. 52(3): 127-136 DOI: | ||
Calculation Method for the Passive Limit Support Pressure of an Extra-Large Diameter Slurry Balance Pipe-Jacking Machine in Clay | ||
(1 Key Laboratory for Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092; 2 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 3 Shanghai Urban Construction Municipal Engineering Group Co. Ltd., Shanghai 200065) | ||
Received null Revised null | ||
Supporting info | ||
|