Application of the Micro-Disturbance Technique for Shield Tunnelling under the Main Runway of an Airport
(Shanghai Shentong Metro Group Co. Ltd., Shanghai 201103)
Download: PDF (2411KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Design, construction and monitoring should be taken into consideration during shield tunnelling in order to ensure micro disturbance to the surrounding environment. Under the main runway of an airport, shield tunnelling in soft clay was successfully completed with micro disturbance to the environment due to the help of the numerical analysis of long- and short-term settlements induced by the shield construction and the proposed construction parameters from a test section, a new synchronous grouting slurry with great specific gravity, and real-time automatic scan monitoring with no prism. The results show that the proposed parameters satisfy the requirements of micro disturbance and the runway settlement was under control one year later after adopting the new synchronous grouting slurry.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsMicro-disturbance technique for tunnelling   Main runway of airport   New synchronous grouting slurry   Real-time automatic scan monitoring with no prism     
Abstract: Design, construction and monitoring should be taken into consideration during shield tunnelling in order to ensure micro disturbance to the surrounding environment. Under the main runway of an airport, shield tunnelling in soft clay was successfully completed with micro disturbance to the environment due to the help of the numerical analysis of long- and short-term settlements induced by the shield construction and the proposed construction parameters from a test section, a new synchronous grouting slurry with great specific gravity, and real-time automatic scan monitoring with no prism. The results show that the proposed parameters satisfy the requirements of micro disturbance and the runway settlement was under control one year later after adopting the new synchronous grouting slurry.
KeywordsMicro-disturbance technique for tunnelling,   Main runway of airport,   New synchronous grouting slurry,   Real-time automatic scan monitoring with no prism     
Cite this article:   
.Application of the Micro-Disturbance Technique for Shield Tunnelling under the Main Runway of an Airport[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(3): 164-169
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2016/V53/I3/164
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY