On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731; 3 China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063)
Download: PDF (4471KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract More and more multiple-track tunnels and super-large section tunnels have been built, and disman? tling of temporary strut is a weak point of the whole structure during force transfer when the secondary lining is constructed. It is significant to guarantee structure safety during dismantling of temporary strut. Little systematic research on safety in dismantling of temporary strut of the super-large section tunnel with double-layer primary support has been conducted, so the internal force and security of the two-layer primary support of the Xinkaotang tunnel were analyzed by a numerical analysis and site measurement, and it proves the effect of two-layer primary support on the safety during strut dismantling. The research results indicate that: (1) with constant support thickness and one-time longitudinal dismantling length, the safety factor of secondary primary support is larger than that of the first primary support, and the safety factor of the first primary support is larger than that of the single layer primary support. Change range of safety factor for the first primary support is smaller than that of the single-layer primary support, and the safe factor for the single-layer primary support is smaller than that of the secondary primary support; (2) with the same support pattern, the safety factors increase firstly and then decrease with an increase of the onetime dismantling length. The calculated results of various cases show that the reasonable one-time dismantling length for this project is about 9 m.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsSuper-large section tunnel   Double-layer primary support   Dismantling of temporary strut   Safety fac? tor   Dismantled length     
Abstract: More and more multiple-track tunnels and super-large section tunnels have been built, and disman? tling of temporary strut is a weak point of the whole structure during force transfer when the secondary lining is constructed. It is significant to guarantee structure safety during dismantling of temporary strut. Little systematic research on safety in dismantling of temporary strut of the super-large section tunnel with double-layer primary support has been conducted, so the internal force and security of the two-layer primary support of the Xinkaotang tunnel were analyzed by a numerical analysis and site measurement, and it proves the effect of two-layer primary support on the safety during strut dismantling. The research results indicate that: (1) with constant support thickness and one-time longitudinal dismantling length, the safety factor of secondary primary support is larger than that of the first primary support, and the safety factor of the first primary support is larger than that of the single layer primary support. Change range of safety factor for the first primary support is smaller than that of the single-layer primary support, and the safe factor for the single-layer primary support is smaller than that of the secondary primary support; (2) with the same support pattern, the safety factors increase firstly and then decrease with an increase of the onetime dismantling length. The calculated results of various cases show that the reasonable one-time dismantling length for this project is about 9 m.
KeywordsSuper-large section tunnel,   Double-layer primary support,   Dismantling of temporary strut,   Safety fac? tor,   Dismantled length     
Cite this article:   
.On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(6): 108-116
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2018/V55/I6/108
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY