|
2018, Vol. 55(6): 108-116 DOI: | ||
On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support | ||
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731; 3 China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063) | ||
Received null Revised null | ||
Supporting info | ||
|