Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (1) :205-208    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock
(1 Hebei Oriental College,Langfang 065001; 2 China Light Industry Construction Co., Ltd., Langfang 065001; 3 China Railway No. 3 Engineering Group Co. Ltd., Taiyuan 030001)
Download: PDF (1107KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Aiming at the construction difficulties and hole deviation issuses of diaphragm retaining wall and bored pile in inclined hard rocks, the corresponding construction techniques of hole drilled by rotary drilling rig and trough constructed by piling machine, and bored hole drilled by down-the-hole drill rig + rotary drilling rig were proposed based on a theoretical and practical research, by taking the retaining structure construction of a deep foundation pit of a metro station as an example. The results show that: (1) in the construction of diaphragm retaining structure in hard rock, main holes are constructed with intervals by rotary drilling rig, and accessory holes are constructed by piling machine, which improves the construction speed of retaining structure; (2) It is difficult to construct the bored pile in the hard rock, and the quincunx bores are drilled by down-the-hole drill rig and then followed by rotary drilling, which greatly increases the construction speed; (3) by adjusting the perpendicularity of the rotary drilling rig and the down-the -hole drill rig, the inclination of troughs and holes is avoided, guaranteeing the perpen? dicularity in the inclined rock mass; (4) the technical parameters of rotary drilling rig should be optimized to guarantee the perpendicularity during the rotary drilling construction in inclined hard rocks.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsHard rock stratum   Metro station   Foundation pit   Construction of diaphragm retaining structure   Con? struction of bored pile     
Abstract: Aiming at the construction difficulties and hole deviation issuses of diaphragm retaining wall and bored pile in inclined hard rocks, the corresponding construction techniques of hole drilled by rotary drilling rig and trough constructed by piling machine, and bored hole drilled by down-the-hole drill rig + rotary drilling rig were proposed based on a theoretical and practical research, by taking the retaining structure construction of a deep foundation pit of a metro station as an example. The results show that: (1) in the construction of diaphragm retaining structure in hard rock, main holes are constructed with intervals by rotary drilling rig, and accessory holes are constructed by piling machine, which improves the construction speed of retaining structure; (2) It is difficult to construct the bored pile in the hard rock, and the quincunx bores are drilled by down-the-hole drill rig and then followed by rotary drilling, which greatly increases the construction speed; (3) by adjusting the perpendicularity of the rotary drilling rig and the down-the -hole drill rig, the inclination of troughs and holes is avoided, guaranteeing the perpen? dicularity in the inclined rock mass; (4) the technical parameters of rotary drilling rig should be optimized to guarantee the perpendicularity during the rotary drilling construction in inclined hard rocks.
KeywordsHard rock stratum,   Metro station,   Foundation pit,   Construction of diaphragm retaining structure,   Con? struction of bored pile     
Cite this article:   
.Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 205-208
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I1/205
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY