Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (2) :175-181    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Large Deformation Control Techniques for the Muzhailing Tunnel
(China Railway First Survey and Design Institute Group Co., Ltd,Xi′an 710043)
Download: PDF (4919KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In light of large tunnel deformation control, it′ s necessary to consider reinforcement of surrounding rock, large stiffness support, moderate stress release, reasonable construction method and enhanced construction management and so on. Taking the large deformation control during construction of the Muzhailing extra-long tunnel as an example, an analysis and summarization on support structure adjustment process and deformation control concept during the construction of sections with varying degrees of large deformation in inclined shaft and main tunnel were conducted, with the results showing that: (1) for the general large deformation, appropriate improvement of strength and stiffness of support structure can effectively inhibit deformation and support damage; (2) for the medium large deformation, further improvement of strength and stiffness of support structure are to be taken, or radial grouting, lengthened and more dense anchor bolt and local addition of cover arch are to be adopted to basically con? trol deformation; (3) for the severe to extremely severe deformations, comprehensive measures like advance stress release, long and short anchoring system to strengthen surrounding rock and application of multi-layer large-stiffness support, etc. must be adopted to effectively control deformation and ensure construction safety and long-term stability of the structure.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Mugao
KeywordsRailway tunnel   High geostress   Large deformation   Construction method   Deformation control     
Abstract: In light of large tunnel deformation control, it′ s necessary to consider reinforcement of surrounding rock, large stiffness support, moderate stress release, reasonable construction method and enhanced construction management and so on. Taking the large deformation control during construction of the Muzhailing extra-long tunnel as an example, an analysis and summarization on support structure adjustment process and deformation control concept during the construction of sections with varying degrees of large deformation in inclined shaft and main tunnel were conducted, with the results showing that: (1) for the general large deformation, appropriate improvement of strength and stiffness of support structure can effectively inhibit deformation and support damage; (2) for the medium large deformation, further improvement of strength and stiffness of support structure are to be taken, or radial grouting, lengthened and more dense anchor bolt and local addition of cover arch are to be adopted to basically con? trol deformation; (3) for the severe to extremely severe deformations, comprehensive measures like advance stress release, long and short anchoring system to strengthen surrounding rock and application of multi-layer large-stiffness support, etc. must be adopted to effectively control deformation and ensure construction safety and long-term stability of the structure.
KeywordsRailway tunnel,   High geostress,   Large deformation,   Construction method,   Deformation control     
Cite this article:   
YANG Mugao .Large Deformation Control Techniques for the Muzhailing Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(2): 175-181
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I2/175
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY