Construction Technology for the Shaft of Extra-long Micangshan Tunnel
(1 Sichuan Bashan Expressway Co., Ltd. Chengdu 610041; 2 Sichan Vocational and Technical College of Communications, Chendu 611130; 3 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731; 4 China Railway Academy Co., Ltd., Chengdu 610031; 5 Sichuan Chuanjiao Road & Bridge Co., Ltd., Guangyuan 618300)
Download: PDF (3144KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract It is often for the extra-long deep-buried road tunnel to adopt sectional longitudinal ventilation with shaft. As a special type of structure, shaft is characterized by challenging construction, much equipments investment and high risks of safety management. Based on construction of a large and deep shaft of the extra-long Micangshan tunnel on the Batao expressway, it discussed the construction technique, equipment matching and management of large and deep shaft in an environment protection area. Short section advancing and single-layer cast concrete lining were adopted in a ventilation shaft of the extra-long Micangshan tunnel, and the construction equipments are mainly head frame, hoisting equipment, drilling equipment and mucking equipment.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HAN Yuxuan1 LENG Xiqiao2
3 YAN Jinxiu4 ZHANG Rui5
KeywordsExtra-long Micangshan tunnel   Shaft   Construction technique   Construction equipment   Short-section advancing   Single-layer cast concrete lining     
Abstract: It is often for the extra-long deep-buried road tunnel to adopt sectional longitudinal ventilation with shaft. As a special type of structure, shaft is characterized by challenging construction, much equipments investment and high risks of safety management. Based on construction of a large and deep shaft of the extra-long Micangshan tunnel on the Batao expressway, it discussed the construction technique, equipment matching and management of large and deep shaft in an environment protection area. Short section advancing and single-layer cast concrete lining were adopted in a ventilation shaft of the extra-long Micangshan tunnel, and the construction equipments are mainly head frame, hoisting equipment, drilling equipment and mucking equipment.
KeywordsExtra-long Micangshan tunnel,   Shaft,   Construction technique,   Construction equipment,   Short-section advancing,   Single-layer cast concrete lining     
Cite this article:   
HAN Yuxuan1 LENG Xiqiao2, 3 YAN Jinxiu4 ZHANG Rui5 .Construction Technology for the Shaft of Extra-long Micangshan Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(3): 133-138
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I3/133
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY