现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
现代隧道技术
·Online Submission
·Manuscript Tracking
·Peer Review
·Editor Work
·Office Work
·Editor-in-chief
 Journal Online
·Forthcoming Articles
·Current Issue
·Next Issue
·Archive
·Advanced Search
·Read Articles
·Download Articles
·Email Alert
·
 Download
·
More>>  
 
 
2019 Vol.56 Issue.3,Published 25 June 2019

1 Review of Researches on Mechanical Behaviors of Tunnel Fiber Reinforced Concrete Lining
CUI Guangyao1 SUN Lingyun2 ZUO Kuixian1 WANG Mingnian3 JING Hongfei4
2019 Vol. 56 (3): 1-7 [Abstract] ( 665 ) [HTML 1KB] [ PDF 795KB] ( 1681 )
8 On Failure Mechanism of Surrounding Rocks of the Deep-buried Underground Cavern Group under High Geostress and Its Countermeasures
SUN Huixiang
2019 Vol. 56 (3): 8-17 [Abstract] ( 707 ) [HTML 1KB] [ PDF 5612KB] ( 1630 )
18 Research on Interpretation Method of TRT Test Results Based on GOCAD
YUAN Xianfan1 LIAO Dan2
2019 Vol. 56 (3): 18-24 [Abstract] ( 731 ) [HTML 1KB] [ PDF 2598KB] ( 1374 )
25 Characteristics Analysis and Forecast Evaluation of Gas Occurrence of the Longquanshan Tunnel on Chengdu Metro
ZHANG Xiaolin1 CAI Jianhua2 LIAO Yankai2
2019 Vol. 56 (3): 25-30 [Abstract] ( 740 ) [HTML 1KB] [ PDF 2907KB] ( 1516 )
31 On Digital Identification of Water Leakage at Tunnel Lining Based on the Panoramic Developed Image
PENG Bin1, 2 ZHU Zhiheng2 YANG Junsheng2 FU Jinyang2 HE Hongbo1
2019 Vol. 56 (3): 31-37 [Abstract] ( 629 ) [HTML 1KB] [ PDF 3954KB] ( 1781 )
38 Study on the Planning Technology for Metro Built by Double Shield TBM in Old Urban Area
HUANG Yinding1,2
2019 Vol. 56 (3): 38-44 [Abstract] ( 752 ) [HTML 1KB] [ PDF 2559KB] ( 1392 )
45 On Application and Promotion of BIM Technique in Urban Rail Transit Engineering
ZHANG Jinwei1 LIU Zhiguang1 LU qingquan2 ZHANG zhiwei2
2019 Vol. 56 (3): 45-52 [Abstract] ( 721 ) [HTML 1KB] [ PDF 3595KB] ( 1566 )
53 Economical and Ecological Evaluation Index System of the Urban Utility Tunnel Based on PSO-BP Neural Network
XUE Gang ZHANG Xia
2019 Vol. 56 (3): 53-58 [Abstract] ( 786 ) [HTML 1KB] [ PDF 2411KB] ( 1417 )
59 Conception of IOT Technology Based Information System for Subway Patrol
WEN Xiaokai SUN Kun LIU Liang
2019 Vol. 56 (3): 59-64 [Abstract] ( 795 ) [HTML 1KB] [ PDF 3271KB] ( 1682 )
65 Effects of a Tunnel on Ground Motion Amplification
SUN Qiangqiang1 BO JingShan1, 2 LIU Hongshuai3 JING Liping2
2019 Vol. 56 (3): 65-71 [Abstract] ( 678 ) [HTML 1KB] [ PDF 4689KB] ( 1324 )
72 Seismic Response of the Metro Station with Pre-constructed Pipe-roof Integrating Support and Structure under Strong Earthquake Effect
LI Jidong1,2 YOU Xinhua1
2019 Vol. 56 (3): 72-78 [Abstract] ( 783 ) [HTML 1KB] [ PDF 2592KB] ( 1303 )
79 Study on Mechanical Characteristics and Section Design of Trench Type Opencut Tunnel Lining Structure with Deep Covering Soil under Load Reduction
ZHUO Bin1 LI Sheng1 HE Chuan2 WANG Huan3 WANG Qicai1 MA Li4
2019 Vol. 56 (3): 79-87 [Abstract] ( 727 ) [HTML 1KB] [ PDF 3964KB] ( 1463 )
88 Research on Pitch and Thrust Allocation of Shield Used in Inclined Shaft
CHEN Ming GUAN Huisheng XIE Youhui
2019 Vol. 56 (3): 88-94 [Abstract] ( 670 ) [HTML 1KB] [ PDF 2008KB] ( 1363 )
95 Monitoring and Analysis of Pipe Jacking Force in the Shenyang Urban Stratum
WANG Xueliang1 JI Xinbo2 XIA Mengran1 TAN Zhiming2 HOU Zhiqiang2 ZHANG Jihua2
2019 Vol. 56 (3): 95-101 [Abstract] ( 750 ) [HTML 1KB] [ PDF 4354KB] ( 1429 )
102 Optimization of Loosing Circle Support of Stoping Roadway with Large Inclination
ZENG Lai1 LIU Yong2 YANG Hongyun2,3 GUO Ping4
2019 Vol. 56 (3): 102-108 [Abstract] ( 738 ) [HTML 1KB] [ PDF 2834KB] ( 1489 )
108 On Deformation Control for the Shield Passing through Old Embankment to Be Rebuilt in Soft Soil Area
JI Chang1 WANG Li2
2019 Vol. 56 (3): 108-117 [Abstract] ( 738 ) [HTML 1KB] [ PDF 3624KB] ( 1279 )
118 Influence of Perforation in Steel Arch on Structural Stiffness
WANG Yue SHI Jiyao
2019 Vol. 56 (3): 118-124 [Abstract] ( 539 ) [HTML 1KB] [ PDF 4597KB] ( 1356 )
125 Field Test and Analysis of Mechanical Behaviors of the Self-drilling Hollow Grouting Anchor Bolt for the Tunnel in Sandy Pebble Stratum
CAO Xiaoyong1 FENG Zhihua1,3 SHI Yanwen2 SONG Feiting2 LAI Jinxing2
2019 Vol. 56 (3): 125-132 [Abstract] ( 631 ) [HTML 1KB] [ PDF 4574KB] ( 1476 )
133 Construction Technology for the Shaft of Extra-long Micangshan Tunnel
HAN Yuxuan1 LENG Xiqiao2,3 YAN Jinxiu4 ZHANG Rui5
2019 Vol. 56 (3): 133-138 [Abstract] ( 755 ) [HTML 1KB] [ PDF 3144KB] ( 1793 )
139 Study on Construction Sequence of Four Overlapped Bored Tunnels with Small-spacing
WANG Meng SHI Mengxiao XU Manji WU Wenpeng
2019 Vol. 56 (3): 139-146 [Abstract] ( 624 ) [HTML 1KB] [ PDF 4250KB] ( 1530 )
147 Exploration of Large Confined Aquifer of the Yonglian Tunnel and Relevant Treatment Measures
WANG Deming WU Yueyue SUN Huadong TIAN Shanjun
2019 Vol. 56 (3): 147-153 [Abstract] ( 582 ) [HTML 1KB] [ PDF 4976KB] ( 1319 )
154 Experimental Study on Ground Dewatering of the Soft Plastic Loess Tunnel on the Yinchuan-Xi′an Railway
ZHANG Xiaoyu
2019 Vol. 56 (3): 154-160 [Abstract] ( 565 ) [HTML 1KB] [ PDF 1847KB] ( 1447 )
161 Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress
LI Yanzong ZHAO Shuang
2019 Vol. 56 (3): 161-165 [Abstract] ( 597 ) [HTML 1KB] [ PDF 1014KB] ( 1390 )
166 Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway
KONG Qingxiang ZHAI Renfeng
2019 Vol. 56 (3): 166-171 [Abstract] ( 642 ) [HTML 1KB] [ PDF 3443KB] ( 1234 )
172 Pre-reinforcement Technology of Shield Tunnelling in Compound Stratum with Sand and Gravel
HOU Ceyuan CHEN Tian XUE Hongping
2019 Vol. 56 (3): 172-176 [Abstract] ( 671 ) [HTML 1KB] [ PDF 1532KB] ( 1407 )
177 Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro
SHANG Youlei1 TAN Zhun2
2019 Vol. 56 (3): 177-185 [Abstract] ( 673 ) [HTML 1KB] [ PDF 6357KB] ( 1436 )
186 Research and Application of New Grouting Technology with Rigid Sleeve Valve Pipe Strand
SUN Guoqing PENG Feng ZOU Mingbo
2019 Vol. 56 (3): 186-191 [Abstract] ( 731 ) [HTML 1KB] [ PDF 1920KB] ( 1458 )
192 Recycle Application of the Shield Waste Slurry in Backfill Grouting Material: A Case Study of a Slurry Shield Tunnelling in the River-crossing Fuzhou Metro
YANG Zhao1,3 HE Zuhao1,2 LIU Yi1,2 CHEN Peishuai1,2 LI Dejie1,3
2019 Vol. 56 (3): 192-199 [Abstract] ( 709 ) [HTML 1KB] [ PDF 2536KB] ( 1316 )
200 Development and Application of the Steel-Wood Combined End Formwork for Construction Joints of Tunnel Secondary Lining
WAN Li1 ZHOU Leisheng2 SUN Changhai1
2019 Vol. 56 (3): 200-205 [Abstract] ( 715 ) [HTML 1KB] [ PDF 2906KB] ( 1463 )
206 Application of Innovative Waterproof Board Laying Trolley in the Beitaizi Tunnel
YUAN Rongtao1 ZHAI Renfeng2 CHEN Haitao1
2019 Vol. 56 (3): 206-211 [Abstract] ( 604 ) [HTML 1KB] [ PDF 2817KB] ( 1444 )
MODERN TUNNELLING TECHNOLOGY
More>>  
·
·
More>> 
 
 
 
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn