Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro
(1 China Railway Erju 4th Engineering Co., Ltd., Chengdu 610306; 2 China Railway Erju Group Corporation Survey and Design Institute Col, Ltd., Chengdu 610031)
Download: PDF (6357KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction methods of side drift, CD or double side drift are often adopted for the super-large sec? tion metro station, and the construction procedures are complex and construction technique is challenging due to excavation of many pilot tunnels. An optimization was conducted for the mined construction method taken in the largesection metro station considering the actual geological conditions based on the Liuhualu station of Guangzhou metro line 11, and the safety and reliability of the optimized construction method were calculated and analyzed by MidasGTS. The results show this optimized construction method is favorable for reducing construction period, the structural settlement and heaving both meet relevant requirements, and the construction safety and structural reliability can be guaranteed; site monitoring should be strengthened, primary support should be taken in time and secondary lining should be carried out at proper time.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SHANG Youlei1 TAN Zhun2
KeywordsSuper-large section   Metro station   Side drift method   CD construction method   Double side drift con? struction method   PBA construction method   Optimization     
Abstract: The construction methods of side drift, CD or double side drift are often adopted for the super-large sec? tion metro station, and the construction procedures are complex and construction technique is challenging due to excavation of many pilot tunnels. An optimization was conducted for the mined construction method taken in the largesection metro station considering the actual geological conditions based on the Liuhualu station of Guangzhou metro line 11, and the safety and reliability of the optimized construction method were calculated and analyzed by MidasGTS. The results show this optimized construction method is favorable for reducing construction period, the structural settlement and heaving both meet relevant requirements, and the construction safety and structural reliability can be guaranteed; site monitoring should be strengthened, primary support should be taken in time and secondary lining should be carried out at proper time.
KeywordsSuper-large section,   Metro station,   Side drift method,   CD construction method,   Double side drift con? struction method,   PBA construction method,   Optimization     
Cite this article:   
SHANG Youlei1 TAN Zhun2 .Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(3): 177-185
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I3/177
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY