现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2019, Vol. 56(3): 177-185    DOI:
Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro
(1 China Railway Erju 4th Engineering Co., Ltd., Chengdu 610306; 2 China Railway Erju Group Corporation Survey and Design Institute Col, Ltd., Chengdu 610031)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn