现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2019, Vol. 56(4): 119-126    DOI:
Influence of Construction Sequence and Different Types of Pipes on Ground Surface Settlement Caused by the Construction of Two-layer Jacking-pipes
(1 Guangzhou Municipal Engineering Group Co., Ltd., Guangzhou 510060; 2 Municipal Engineering Technology Research Institute,Guangzhou Municipal Engineering Group Co. Ltd., Guangzhou 510060)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn