|
2020, Vol. 57(3): 1-8 DOI: | ||
Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology | ||
(1 China Railway No.2 Engineering Group Co.,Ltd, Chengdu 610032;2 Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization, Institute of Deep Earth Sciences and Green Energy, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060) | ||
Received null Revised null | ||
Supporting info | ||
|