Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (3) :1-8    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology
(1 China Railway No.2 Engineering Group Co.,Ltd, Chengdu 610032;2 Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization, Institute of Deep Earth Sciences and Green Energy, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060)
Download: PDF (2004KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to comprehensively improve the ability and means to deal with the complex problems in the con? struction of the Sichuan-Tibet railway tunnel project, a tunnel construction management system for the Ya ′an-Linzhi section of the Sichuan-Tibet Railway is established based on system engineering methodology by taking time dimension, logical dimension, knowledge dimension and environmental dimension as the basic structure. Aiming at the main challenges faced by the Sichuan-Tibet railway tunnel project, it systematically summarizes the countermeasures for the key issues of engineering survey and design, special unfavorable geological condition, construction organization and management in view of the different stages of time dimension, goals of logical dimension and through technology accumulation and research of knowledge dimension,providing a reference for the construction and management of tunnel project of Ya′an-Linzhi section. The research indicates:(1) the tunnel project is critical for the entire Sichuan-Tibet Railway, and so a system engineering methodology based full-cycle construction management system should be established; (2) the main technical challenge of the Sichuan-Tibet railway tunnel is the special complex geological condition, related solutions should be put forward in the feasibility study and design stages and further application research should be conducted in implementation stage to guarantee effectiveness and reliability of the countermeasures; (3) in light of the harsh environmental conditions, extreme geological challenges and super-long construction period of the Sichuan-Tibet Railway tunnel, a higher level of“Four Modernizations”and breakthrough in management innovation are required; (4) aiming at the complexity of the construction and management of the SichuanTibet railway tunnel, no participant can independently handle the management risks of this huge system project and it is necessary to establish a higher-level full-cycle integrated management mechanism, implementing stricter ecological environmental protection and organizing stronger scientific and technological innovation support.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
MA Hui1 GAO Mingzhong2
KeywordsSystem engineering methodology   Sichuan-Tibet railway   Tunnel engineering   Construction management   Construction organization   Full-cycle integrated management mechanism     
Abstract: In order to comprehensively improve the ability and means to deal with the complex problems in the con? struction of the Sichuan-Tibet railway tunnel project, a tunnel construction management system for the Ya ′an-Linzhi section of the Sichuan-Tibet Railway is established based on system engineering methodology by taking time dimension, logical dimension, knowledge dimension and environmental dimension as the basic structure. Aiming at the main challenges faced by the Sichuan-Tibet railway tunnel project, it systematically summarizes the countermeasures for the key issues of engineering survey and design, special unfavorable geological condition, construction organization and management in view of the different stages of time dimension, goals of logical dimension and through technology accumulation and research of knowledge dimension,providing a reference for the construction and management of tunnel project of Ya′an-Linzhi section. The research indicates:(1) the tunnel project is critical for the entire Sichuan-Tibet Railway, and so a system engineering methodology based full-cycle construction management system should be established; (2) the main technical challenge of the Sichuan-Tibet railway tunnel is the special complex geological condition, related solutions should be put forward in the feasibility study and design stages and further application research should be conducted in implementation stage to guarantee effectiveness and reliability of the countermeasures; (3) in light of the harsh environmental conditions, extreme geological challenges and super-long construction period of the Sichuan-Tibet Railway tunnel, a higher level of“Four Modernizations”and breakthrough in management innovation are required; (4) aiming at the complexity of the construction and management of the SichuanTibet railway tunnel, no participant can independently handle the management risks of this huge system project and it is necessary to establish a higher-level full-cycle integrated management mechanism, implementing stricter ecological environmental protection and organizing stronger scientific and technological innovation support.
KeywordsSystem engineering methodology,   Sichuan-Tibet railway,   Tunnel engineering,   Construction management,   Construction organization,   Full-cycle integrated management mechanism     
Cite this article:   
MA Hui1 GAO Mingzhong2 .Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 1-8
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/1
 
No references of article
[1] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[2] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[3] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[4] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[5] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[6] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[7] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[8] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[9] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[10] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[11] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[12] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[13] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[14] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
[15] WU Bo.Research on Blasting Optimization of Urban Large Cross-section Tunnel Passing through Stratified Sandstone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 115-121
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY