Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology
(1 China Railway No.2 Engineering Group Co.,Ltd, Chengdu 610032;2 Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization, Institute of Deep Earth Sciences and Green Energy, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060)
Download: PDF (2004KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to comprehensively improve the ability and means to deal with the complex problems in the con? struction of the Sichuan-Tibet railway tunnel project, a tunnel construction management system for the Ya ′an-Linzhi section of the Sichuan-Tibet Railway is established based on system engineering methodology by taking time dimension, logical dimension, knowledge dimension and environmental dimension as the basic structure. Aiming at the main challenges faced by the Sichuan-Tibet railway tunnel project, it systematically summarizes the countermeasures for the key issues of engineering survey and design, special unfavorable geological condition, construction organization and management in view of the different stages of time dimension, goals of logical dimension and through technology accumulation and research of knowledge dimension,providing a reference for the construction and management of tunnel project of Ya′an-Linzhi section. The research indicates:(1) the tunnel project is critical for the entire Sichuan-Tibet Railway, and so a system engineering methodology based full-cycle construction management system should be established; (2) the main technical challenge of the Sichuan-Tibet railway tunnel is the special complex geological condition, related solutions should be put forward in the feasibility study and design stages and further application research should be conducted in implementation stage to guarantee effectiveness and reliability of the countermeasures; (3) in light of the harsh environmental conditions, extreme geological challenges and super-long construction period of the Sichuan-Tibet Railway tunnel, a higher level of“Four Modernizations”and breakthrough in management innovation are required; (4) aiming at the complexity of the construction and management of the SichuanTibet railway tunnel, no participant can independently handle the management risks of this huge system project and it is necessary to establish a higher-level full-cycle integrated management mechanism, implementing stricter ecological environmental protection and organizing stronger scientific and technological innovation support.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
MA Hui1 GAO Mingzhong2
KeywordsSystem engineering methodology   Sichuan-Tibet railway   Tunnel engineering   Construction management   Construction organization   Full-cycle integrated management mechanism     
Abstract: In order to comprehensively improve the ability and means to deal with the complex problems in the con? struction of the Sichuan-Tibet railway tunnel project, a tunnel construction management system for the Ya ′an-Linzhi section of the Sichuan-Tibet Railway is established based on system engineering methodology by taking time dimension, logical dimension, knowledge dimension and environmental dimension as the basic structure. Aiming at the main challenges faced by the Sichuan-Tibet railway tunnel project, it systematically summarizes the countermeasures for the key issues of engineering survey and design, special unfavorable geological condition, construction organization and management in view of the different stages of time dimension, goals of logical dimension and through technology accumulation and research of knowledge dimension,providing a reference for the construction and management of tunnel project of Ya′an-Linzhi section. The research indicates:(1) the tunnel project is critical for the entire Sichuan-Tibet Railway, and so a system engineering methodology based full-cycle construction management system should be established; (2) the main technical challenge of the Sichuan-Tibet railway tunnel is the special complex geological condition, related solutions should be put forward in the feasibility study and design stages and further application research should be conducted in implementation stage to guarantee effectiveness and reliability of the countermeasures; (3) in light of the harsh environmental conditions, extreme geological challenges and super-long construction period of the Sichuan-Tibet Railway tunnel, a higher level of“Four Modernizations”and breakthrough in management innovation are required; (4) aiming at the complexity of the construction and management of the SichuanTibet railway tunnel, no participant can independently handle the management risks of this huge system project and it is necessary to establish a higher-level full-cycle integrated management mechanism, implementing stricter ecological environmental protection and organizing stronger scientific and technological innovation support.
KeywordsSystem engineering methodology,   Sichuan-Tibet railway,   Tunnel engineering,   Construction management,   Construction organization,   Full-cycle integrated management mechanism     
Cite this article:   
MA Hui1 GAO Mingzhong2 .Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 1-8
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/1
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY