现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2020, Vol. 57(3): 167-174    DOI:
Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock
(1 Constructing Headquarters of the Yunnan Chuxiong-Dayao Expressway,Chuxiong 650228; 2 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092;3 Department of Geotechnical Engineering,Tongji University,Shanghai 200092)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn