|
2020, Vol. 57(3): 167-174 DOI: | ||
Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock | ||
(1 Constructing Headquarters of the Yunnan Chuxiong-Dayao Expressway,Chuxiong 650228; 2 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092;3 Department of Geotechnical Engineering,Tongji University,Shanghai 200092) | ||
Received null Revised null | ||
Supporting info | ||
|